Installing The Turbocharger - ABB HT846804 Operation Manual

Table of Contents

Advertisement

Operation Manual / TPL65-A10 / -A30
7 Removal and installation / 7.3 Installing the turbocharger

7.3 Installing the turbocharger

© Copyright 2020 . All rights reserved.
Remove cover from oil connection.
u
Inspect lifting gear.
u
Fasten lifting gear to each of two bearing casing ribs provided for
u
this purpose.
CAUTION
Oil orifices
There is an orifice for adjusting the oil pressure in each of the two oil
supply pipes of the bearing casing. When the cartridge group, the bear-
ing casing or the turbocharger-is being fitted to the engine, it must be
ensured that the orifices specified for the turbocharger are installed in
both oil supply pipes.
Check that the oil orifices have been correctly installed.
u
Adapt turbocharger to suit engine.
u
Tighten fixing screws in foot in accordance with engine builder's in-
u
structions.
Fasten gas, air and oil lines in accordance with engine builder's in-
u
structions.
Refit removed parts of insulation.
u
Plug in cable connector on speed sensor.
u
HZTL2482_EN
Rev.E
March 2020

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tpl65-a30

Table of Contents