Fig. 109: Fitting The Upper Fastening Strips; Fig. 110: Fitting The Bottom Fastening Strip; Table 68: Tightening Torque (51007) - ABB HT604539 Operation Manual

Turbocharging
Table of Contents

Advertisement

Operation Manual / A150-M56/66/57/67 - A155-M..
12 Dismantling and fitting, special tools for fastening strips / 12.1 Ap-
plication, special tools
5. Loosen the nuts (51007) from the remaining fastening strips and remove the lugs (51002)
with washers (51003).
Fitting the fastening strips
Fig. 109: Fitting the upper fastening strips
Product
A150
A155
Table 68: Tightening torque (51007)
1. Fit the nuts (51007) of the (upper) fastening strips (51002) illustrated and tighten with a
torque spanner (02) without a spanner holder. Observe the tightening torque.
Fig. 110: Fitting the bottom fastening strip
2. Position the collection tub (01) to catch any fixing elements if they fall.
3. Tighten the two nuts on one side by using the spanner holder (90165).
© Copyright 2021 ABB. All rights reserved.
Size
M16
M16
HZTL4032_EN
Tightening torque [Nm]
175
175
Rev.Q
January 2021

Advertisement

Table of Contents
loading

Table of Contents