Download Print this page

CDA TC28CH Quick Start Manual page 2

Advertisement

Installation
1.
Screw studded rod (D) into the base of the tap (A).
2.
Place the upper seal (C) into the base plinth (B) then place the base plinth (B) onto the bottom of the tap (A).
3.
Screw the hot & cold water tail pipes (I & J) into the base of the tap (A) as shown.
4.
Place the mixertap (A) and base plinth (B) onto the sink/worktop, passing the tail pipes (I & J) and studded rod (D) through the tap hole and base
plinth (B)
5.
Pass the triangular stabiliser (E), lower gasket (F) and then the fixing bracket (G) over the studded rod (D) and around the flexible tail pipes (I & J)
6.
Fasten the fixing nut (H) securely onto the fixing stud (D) to fix the tap (A) into its correct location.
7.
Connect the hot and cold tail pipes (I & J) to the water mains using ½" BSPx15mm compression fittings. Note: Non-return valves will be pre-
inserted into tail pipes (I & J).
Parts and Contents
Key
Description
A
Mixertap body
B
Base plinth
C
Upper seal
D
Fixing stud
E
Triangular stabilising bracket
F
Lower gasket
G
Fixing bracket
H
Fixing nut
Hot Flexi tail
I
(with integral NRV)
Cold Flexi tail
J
(with integral NRV)
After installation:
Once you have visually checked the new fittings and connections, ensure that all taps are closed except the new mixer tap, which should be left open. Turn
on the water supply at the mains stop cock. As the system starts to refill, check carefully for leaks. Once you are fully satisfied that there are no leaks, turn
on the water heating.
Clean the tap to remove any marks created during installation as instructed then replace the bag that has been provided to protect the tap until it is ready for
use.
Qty
1
1
1
1
1
1
1
1
1
1

Advertisement

loading