Hydro Instruments VPH-10000-2 Vaporizer Table of Contents I. Introduction ......................3 1. Safety Information 2. System Size, Capabilities, and Specifications 3. Units of Measurement II. Installation ......................5 1. Installation of the Vaporizer 2. Installation of Chlorine Pressure Piping 3. Installation of Auxiliary Components 1.
The contents of this manual are intended to provide information regarding the installation, operation, maintenance and troubleshooting of Hydro Instruments’ VPH-10000-2 vaporizer. It is critically important to read and become familiar with the contents of this entire manual before proceeding to install or operate the unit.
When working with Chlorine • Ensure that approved, self-contained breathing and safety equipment are always available and ready for use and personnel are properly trained for its use. • Safety equipment should be inspected and maintained in accordance with the manufacturer’s instructions.
⁄ " concrete anchor bolts through the bottom plate. If installing multiple vaporizers, Hydro Instruments recommends leaving at least 2 feet of clearance space between each vaporizer for ease of access. If using automatic water control, a ½" water pipeline should be installed to the water solenoid valve.
3.2 Pressure Relief Valve Assembly The pressure relief valve assembly is a critical component to any chlorine vaporizer system and is required by ASME code for operation. This mechanical safety device limits the pressure of the chlorine pressure chamber to a maximum value. The rupture disc must be properly installed into the rupture disk holder prior to installing the rupture disk assembly onto the pipe.
4. Electrical Installation 4.1 Connecting the Main Power: The VPH-10000-2 requires three phase power. All power connections are made through the heater control box. Warning: Electrical shock hazard. Ensure all power is disconnected from the source before proceeding. Ensure that only qualified personnel are working on this equipment. a.
SCADA system. See Section III.5 for information on how to access and edit these features. A table of Modbus integers and their corresponding parameters can be seen in Table 3. For more information on configuring Hydro Instruments equipment onto SCADA systems, please refer to the Modbus Installation and Instruction manual.
Page 9
TAbLE 3: Modbus Information Register Name Type Address Feature Value Gas Temperature Integer Gas Pressure Integer Gas Pressure Span Integer High Pressure Alarm Level Integer Superheat Temperature Integer Superheat Alarm Set Point Integer Control Water Temperature Integer Water Temperature Set Point Integer High Temperature Alarm Set Point Integer...
Page 12
FIgurE 3: relay Output box Line 2 (Red) MB108 Line 2 (Red) PRV #1 Solenoid Connect Line 2 PRV #1 Here Line 2 (Red) Solenoid Not Used Contactor Line 2 (Red) Heater Contactor Optional PRV #2 Superheat Alarm High Pressure Alarm Water Level Alarm MB123 Low Water Temp Alarm...
Page 13
FIgurE 4: Vaporizer Controller FIGURE 4: Vaporizer Controller MAIN CONTROLLER CATHODIC PROTECTION CONTROL & AMMETER WATER LEVEL INDICATOR THREE PHASE DISCONNECT SWITCH HEATER CONTROL BOX SINGLE PHASE DISCONNECT SWITCH MANUAL CONTACTOR OVERRIDE CONTACTOR INDICATOR STATUS (ON = ENERGIZED)
These residues can cause accelerated pipe corrosion and result in a leak. NOTe: Before performing this step, be sure to read Hydro Instruments “Nitrogen Purging” document for further information.
2. Initial Start-up Only refer to the start-up procedure outlined in this section if the previous Section III.1 leak test has already been completed and you are now performing the initial start-up, the piping has been changed, the vaporizer has just been cleaned, or in any other situation in which air/moisture has been allowed to enter the system.
4.1 Short Term Shut Down A short term shut down is defined as any situation where the chemical feed is only temporarily interrupted, and the heater and all control functions will remain on. Hydro Instruments recommends the following procedure: a. If applicable, temporarily stop chemical feed at the vacuum regulator and allow liquid to fill back into the container.
Wait for 30 minutes to ensure pressure readings hold at 0 psi and then repeat this step as necessary. d. Purge the system with dry air or nitrogen according to the instructions in the Hydro Instruments Nitrogen Purging document. Then operate the ejector again to remove all gas from the system until the pressure gauges read zero.
Page 18
FIgurE 5: Operating/Configuration Screens Figure 5. Operating/Configuration Screens T=100F P= 85 psi Select PRV on Duty Superheat = 32 F PRV#1/Relay1 Control Water Temp Modbus Baud=250000 180 F Node=1 Data=8/N/1 Heater Power Pressure Span 9.0 kW (50%) 300 psi Solenoid = Closed T180 S=180 O=50 E00 Hold “+”...
5.1 Explanation of Main Controller Screens 1. Operation Screen: This screen displays a live reading of the pressure chamber operating conditions. These parameters include: gas temperature, gas pressure and superheat. 2. Water Temperature: This screen displays a live reading of the water tank temperature. This is the temperature reading that is used for PID control of the water temperature and all appropriate water temperature alarms.
Page 20
The new span must then be adjusted on this screen to match the incoming 4-20 mA signal. Consult Hydro Instruments before changing pressure ranges or pressure transmitters. 16. PID Control Setting: This screen displays and allows the user to adjust the PID control settings of the vaporizer.
6. Operating Controls and Components 1. Chlorine Gas Temperature Thermocouple: The chlorine gas outlet temperature is monitored by a K-type thermocouple through the top flange of the chlorine pressure chamber. For added corrosion protection it is installed with a Hastelloy-C thermowell. Its main function is to provide visual indication of the chlorine gas outlet temperature, and together with the chlorine gas pressure transmitter, is used to calculate and then display the superheat value.
7. Alarms and Features Refer to Table 4 for a description, and action of all alarms incorporated into the vaporizer unit. Note that while some alarms take preventative action themselves, an operator should always monitor an alarm situation and take preventative action if need be or the situation persists. For information on troubleshooting techniques see Section V.
IV. MAInTEnAnCE 1. Yearly Maintenance 1.1 Chlorine Pressure Chamber Cleaning It is important to inspect and clean the chlorine pressure chamber for signs of corrosion, buildup of debris and clogging. It is recommended to be done on a yearly basis. Ignoring this maintenance step can lead to serious malfunctions of the vaporizer.
1.2. Alarms and Switches Testing Alarms and switches should be tested at least once a year. Before proceeding to perform any testing or maintenance ensure that all chlorine has been completely purged from the system and that the chlorine container valves and inlet manifold piping valves are closed. Please refer to Section III.4.2 for long term system shut down before performing any of the below procedures.
" (0.3 cm) depth anywhere on the chamber, it must be replaced. This weight includes the top flange, flange bolts, and lead gasket. Original weight is stamped on the pressure chamber and also stored with Hydro Instruments for future reference. d. Complete Section IV.1 steps i through n.
V. TrOubLESHOOTIng: Refer to Table 5 for common problems and troubleshooting techniques for the vaporizer system. For questions please consult Hydro Instruments. TAbLE 5: Troubleshooting Chart Problem Probable Cause(s) Corrective Action • Liquid chlorine in • Demand has exceeded design capacity •...
Page 27
Problem Probable Cause(s) Corrective Action • Low water • Chemical capacity exceeded • Lower feed capacity temperature • Improper wiring/failed heater. • Check wiring/replace or clean heater Fouling of heater surface • Improper wiring/failed temperature • Check wiring/replace PID controller controller •...