Gigabyte G492-ZD0 User Manual page 31

Hpc server - 4u dp sxm4 a100 8 gpu server
Hide thumbs Also See for G492-ZD0:
Table of Contents

Advertisement

4
6
5
7
2
3
1
• • When installing the heat sink over the CPU, use T30-Lobe driver to tighten the 4 captive nuts in
sequential order (1g2g3g4).
• • The screw tightening torque: 16.1 ± 1.2 kgf-cm (14.0± 1.0 lbf-in)
- 31 -
System Hardware Installation

Advertisement

Table of Contents
loading

Table of Contents