Download Print this page

Advertisement

Quick Links

Installation Guidelines
Projecting Systems
Installation Tips
3
Using the included tool, drive
your hanger screws into the nylon
anchors, then tighten barrels to
surface.
4
Screw threaded studs into your
barrels, then place your panel in
position and thread on caps until
snug.
Body
M6x8 with PE cap
Hanger Bolt
Address: Htm-Mbs
6420 Benjamin Rd,
Tampa, FL. 33634
Always check the installation surface
to ensure that the substrate will be
strong enough to hold the weight of
the panel. All installation must be
done so with proper hardware and
protective gears to ensure safety. It
is important to check that parts are
properly tightened at the end of each
installation.
1
Use the holes in your material
as a template to mark holes on
your mounting surface.
2
Pre-drill 1/4" holes in your
surface,
anchors into the holes and tap
them flush.
Phone : 1-813-938-6025
Fax :
1-813-425-9007
Mail: sales@mbs-standoffs
then
insert
nylon

Advertisement

loading
Need help?

Need help?

Do you have a question about the PS375 and is the answer not in the manual?

Questions and answers

Summary of Contents for MBS PS375

  • Page 1 Screw threaded studs into your barrels, then place your panel in position and thread on caps until snug. Address: Htm-Mbs Phone : 1-813-938-6025 6420 Benjamin Rd, Fax : 1-813-425-9007 Tampa, FL. 33634 Mail: sales@mbs-standoffs...
  • Page 2 Screw threaded studs into your barrels, then place your panel in position and thread on caps until snug. Address: Htm-Mbs Phone : 1-813-938-6025 6420 Benjamin Rd, Fax : 1-813-425-9007 Tampa, FL. 33634 Mail: sales@mbs-standoffs...