5030- Flush Pop Up Outlet
Installation Instructions
QUAD
TRIO
5030-1333
5030-1330
5030-1133
5030-1130
Tower
Release
Button
Base
Downloadable Resources
For additional planning resources, visit
dockingdrawer.com/downloads
• Electrical Certifications
• Spec Books
• Tear Sheets
• Cut Out Templates
•
For indoor use only.
•
Avoid liquid spills into the outlet.
•
When using the wireless charger, do not place
metal objects, magnets, magnetic stripe cards, etc.
•
Be sure to ground connection.
•
Do not disassemble the unit.
DUO
5030-1300
•
If the product has malfunctioned, electrical
maintenance is required by a professional.
How to Install the Outlet
Step 1 -
Select a location for the pop-up outlet that
QI Wireless
Charging Top
meets the following requirements:
•
1 USB-C (PD)
The edge of the cut out should be at least 40mm
& 1 USB-A
from the nearest wall.
Outlet #1
•
A power outlet should be within 1.5 meters of the
installation cut out for the power cord to reach.
Outlet #2
•
Benchtop thickness is between 10-45mm.
•
Consult the following illustrations to ensure there is
Outlet #3
sufficient space underneath the benchtop.
Ring
QUAD
Adjustable
Ring
5030-1333
5030-1133
10-45
mm
benchtop
thickness
CAUTION – READ CAREFULLY
326
mm
of space needed
under benchtop
TRIO
5030-1330
5030-1130
10-45
mm
benchtop
thickness
277
of space needed
under benchtop
DUO
5030-1300
10-45
mm
benchtop
thickness
227
of space needed
under benchtop
Step 2 -
Cut a
95mm hole in
the surface of
the benchtop to
create the installation
cut out.
mm
mm
Cut out size
95
mm
Need help?
Do you have a question about the QUAD 5030-1333 and is the answer not in the manual?
Questions and answers