Advertisement

READ ME FIRST
IMPORTANT UNPACKING
INSTRUCTIONS
The DX Engineering RT4500HD Rotator must be carefully unpacked to
avoid damage or injury. The DXE-RT-4500HD weighs approximately 22
pounds. Please review this important information.
1. Upon opening the box (there is a label indicating "This Side Up" on
the box). Carefully slit the tape and open the box. Set the enclosed
instruction manual aside. There are three pieces of custom cut foam
holding the rotator in place for shipping.
2. When the box is opened – carefully roll the box
upside down on your workbench. Lift the box upward.
The rotator and packing foam, will slide out. The top
piece of foam may stay in the box. If so, remove the
Hardware Package and set aside. If the top foam stays
on the rotator, lift the foam off of the rotator and remove
the Hardware Package and set it aside.
3. Lift the second piece of foam upward, pressing the connector as
shown. Once the connector is released from the foam, remove the foam.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RT4500HD and is the answer not in the manual?

Questions and answers

Summary of Contents for DX Engineering RT4500HD

  • Page 1 READ ME FIRST IMPORTANT UNPACKING INSTRUCTIONS The DX Engineering RT4500HD Rotator must be carefully unpacked to avoid damage or injury. The DXE-RT-4500HD weighs approximately 22 pounds. Please review this important information. 1. Upon opening the box (there is a label indicating “This Side Up” on the box).
  • Page 2 DXEngineering@DXEngineering.com For best service, please take a few minutes to review this instruction sheet before you call. © DX Engineering 2022 1200 Southeast Ave. - Tallmadge, OH 44278 ∙ Phone: (800) 777-0703 Tech Support and International: (330) 572-3200 ∙ Fax: (330) 572-3279 E-mail: DXEngineering@DXEngineering.com...

This manual is also suitable for:

Dxe-rt-4500hd

Table of Contents