GPS iMEASURE-D Installation, Operation & Maintenance Manual

Advertisement

Quick Links

GPS-iMEASURE-D
Installation, Operation & Maintenance Manual
www.globalplasmasolutions.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the iMEASURE-D and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for GPS iMEASURE-D

  • Page 1 GPS-iMEASURE-D Installation, Operation & Maintenance Manual www.globalplasmasolutions.com...
  • Page 2 • 24V power supply (voltage supplied must be floating) for input voltages other than 100-240V Installation Location GPS recommends the GPS-iMEASURE-D be installed on or in the duct downstream of the ionizer, away from extreme heat and condensation. Mount in location with minimal turbulence. The unit should be mounted prior to the first take-off if any exists.
  • Page 3 Self-Test Upon power up and once every hour the GPS-iMEASURE-D will perform a self-test. During the self-test the device’s ion sensitivity is tested. During the self-test the output levels are held at the pre-auto zero level. Upon a fault, the LED will flash alternating red and green, and the output level will be pegged at 10V (remote indication of error).
  • Page 4 Accumulation of lint and dust, spider webs or web fragments within the ion chamber can cause inaccurate readings, the inability to auto-zero or the ability to maintain a proper chamber voltage. This can usually be corrected by cleaning the chamber with canned compressed air. It is advisable to periodically blow out the chamber with compressed air.
  • Page 5 To access a list of applicable patents, please visit www.gpspatents.com www.gpsair.com www.globalplasmasolutions.com © 2022 GPS Air GPS Air is the owner of certain trademarks that appear in our materials. Please visit www.gpsair.com/trademarks for a list of our marks. GPS-041-20-R21-iMD IOM...

Table of Contents