Micro Rain MR 25 Instruction Manual For Operation And Maintenance

Advertisement

Quick Links

MR 25
Instruction Manual For Operation
and Maintenance
KID Group
15250 Sunshine Rd.
Yukon, OK. 73099
800-373-9325

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MR 25 and is the answer not in the manual?

Questions and answers

Summary of Contents for Micro Rain MR 25

  • Page 1 MR 25 Instruction Manual For Operation and Maintenance KID Group 15250 Sunshine Rd. Yukon, OK. 73099 800-373-9325...
  • Page 2 Safety is the main priority and failure to follow these instructions may cause serious injury. Micro Rain is not responsible for machine failure or personal injury if these procedures and operation instructions are not followed.
  • Page 3: Identification Data

    Identification Data The identification plate includes the model and serial number for your machine. Machine Controls & Components Shut off valve latch Drum Gear (under cover) Shut off valve (pull valve-do Grease zerk for inlet seals not turn) (Open small valve to add grease) Water Connection Point (garden hose) Shut off bar Pressure Gauge...
  • Page 4 Conditions For Machine Operation The MR25 is designed for clean water suitable for irrigation. The machine is not designed for water that includes large pieces of debris or slurry/wastewater conditions. Start Up Procedure/Operation 1) Push the machine to the desired location. Position the ma- chine with the sprinkler cart facing the direction to be irrigated.
  • Page 5 Start Up Procedure/Operation, continued **IMPORTANT: ALWAYS PULL CART OUT STRAIGHT AND TIGHTEN LOOSE WRAPS BEFORE START UP! Always Pull Tube Out Straight! Keep Wraps Tight! 5) Re-engage the turbine assembly by loosening the black knob again and sliding the turbine bracket back into place as shown by white arrow, so that the drive gears mesh.
  • Page 6: Troubleshooting

    Start Up Procedure/Operation, continued 8) Turn on the water source to the MR25. The sprinkler equipped with the MR25 can be set to water a full circle pattern or any part of a circle. It is generally recommended to water a half circle pattern behind the cart, away from the direction of travel.
  • Page 7 Keeps front of machine level and supported in loose soil conditions. MR25 Boost Pump Option 110v Booster kits to boost incoming pressures by 30 to 50 psi. Gas driven booster kits also available. Call your Micro Rain dealer for details.
  • Page 8: Maintenance Schedule

    Maintenance Schedule Inlet seals: Grease inlet seals every 100 hours. Grease drum gear every 100 hours. Drum gear: Turbine Seals: Replace turbine seals every 500 hours or once a season. Consult your dealer for information. Performance Chart MR25 PERFORMANCE CHART 4 mm Nozzle RUN TIME(HRS) INLET PSI...
  • Page 9: Parts Diagrams

    Parts Diagrams DRUM F1625 25MM165 LE25A2000 C6D38000 CD390 LE25A000 LE3240B14 IO62 LE25A8A0 LE3240C15 25MM165 Frame/Chassis LE25B130 C6D38000 CP400000 350X4 LE25B000...
  • Page 10: Drive System

    Parts Diagrams Drive System IO45 P 45.35.7 LE25E010 GMAD4535 LEE50000 IN180000 LE25E020 MV18MF00 LEE2000A LE25E030 PASS035C LE25E140 PASS035B PASS035A LE25E040 F1625000 F2032000 LE25E090 LE25E070 LE25E050 F2032000 F1625000 600320 G40013 TUBAC250 PM50/10x15 F35100002 G40013 1202033 BA026027P2 (Standard Speed Drive Gear-not shown) BA026027L25 (High Speed Drive Gear-not shown) Sprinkler Cart LE25F100...
  • Page 11 Parts Diagrams Shut Off /Speed Control Assy. LE25ND10 LE25D0202 3/4FNPTxGHT LE25D0201 21110730 VIM34000 N1/2-3/8 VS1/2MF 20201/2 FM06000 LE25D0205 51152 LE25D0203 CFM06000...
  • Page 12 If KID Group, Inc. determines that the above warranty was breached with respect to any part or component provided by the manufacturer of Micro Rain equipment, (and if all conditions set forth below have been satisfied) then, KID Group, Inc. will (at KID Group, Inc.’s option) repair or provide purchaser replacement parts F.O.B.

Table of Contents