Download Print this page

TE Connectivity Challenger 361 Series Installation And Operating Instructions page 2

Advertisement

Maintenance
As required, wipe the front face with a damp cloth, ensuring that
no moisture enters the unit or penetrates behind the mounting
panel. No maintenance is required beyond periodically checking
the mechanical zero of the meter as described overleaf in
"commissioning", if necessary removing any accumulations of
dust or other foreign matter from the terminal area and ensuring
that connections remain tight.
Connections
Panel Requirements
While TE has made every reasonable effort to ensure the accuracy of the information in this catalogue, TE does not guarantee that it is error-free, nor does TE make any other representation, warranty or
guarantee that the information is accurate, correct, reliable or current. TE reserves the right to make any adjustments to the information contained herein at any time without notice. TE expressly disclaims
all implied warranties
regarding the information contained herein, including, but not limited to, any implied warranties of merchantability or fitness for a particular
purpose. The dimensions in this catalogue are for reference purposes only and are subject to change without notice. Specifications are subject to change without notice. Consult TE for the latest
dimensions and design specifications. TE connectivity (logo), TE (logo) and TE Connectivity are trademarks of the TE Connectivity Ltd. family of companies. Crompton is a trademark of Crompton
Parkinson and is used by TE Connectivity under a licence. Other logos, product and company names mentioned herein may be trademarks of their respective owners
TE Energy – innovative and economical solutions for the electrical power industry: cable accessories, connectors & fittings, insulators & insulation, surge
arresters, switching equipment, street lighting, power measurement and control.
Tyco Electronics UK Ltd
TE Energy
Freebournes Road
Witham, Essex CM8 3AH
Fax: +44 (0)870 240 5289
Email: Crompton.info@te.com
www.crompton-instruments.com
Commissioning
The units are calibrated at the factory for full accuracy. No further
adjustments are required except to check the zero position. With
the meter in the intended attitude, adjust the centre slotted
adjuster for scale zero without electrical input signal.
recommended that after installation, test signals are applied to
confirm correct indication and that, where applicable, CT phasing
is correct and voltage and current connections match.
Project 1999. Drawing No. CI-3L83501 Rev.2 20/12/21
It is

Advertisement

loading

This manual is also suitable for:

Challenger 362 seriesChallenger 363 seriesChallenger 364 series