UNI-TROL MANAGER Manual

Automatic tyre-changer

Advertisement

Quick Links

ENGLISH
THE MANUAL
AUTOMATIC TYRE-CHANGER
MANAGER
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MANAGER and is the answer not in the manual?

Questions and answers

Summary of Contents for UNI-TROL MANAGER

  • Page 1 ENGLISH THE MANUAL AUTOMATIC TYRE-CHANGER MANAGER...
  • Page 2 Machines manufactured by UNI-TROL are warranted against defects in material and workmanship for a period of one (1) year from the date of sale. Our company is not responsible for any damage or defects resulting from improper use of the device.
  • Page 3: Table Of Contents

    ATTENTION ! • This manual is an integral part of the machine. Read carefully the content of the manual and its appendices. • The information contained in this manual is important for machine’s safe use and maintenance. • Keep this maual in order to avoid problems with the machine in the future. The machine is used for the automatic assembly and disassembly of tyres for passenger cars and vans.
  • Page 4: Machine Components

    MACHINE COMPONENTS BEAD BREAKER SYSTEM quickly and easily detaches the tire from the rim 10" to 24". TABLE 10” – 24” clamps all rims from the inside and outside 1 –BEAD-BREAKER PAD: supports the tyre during the bead- 1 – JAW breaking process.
  • Page 5: Introduction

    INTRODUCTION INTRODUCTION ATTENTION ! TRODUCTION INTRODUCTION This manual is intended for qualified personnel who routinely use this equipment, service, inspect and repair it. Be sure to read the instruction manual before operating this unit. The manual should be kept near the machine in a place easily accessible for the user / service technician.
  • Page 6 BEAD-BREAKING MUST BE DONE WITH NEVER TOUCH THE RIM WITH YOUR THE GREATEST CARE. EVERYTHING HANDS DURING THE BEAD-BREAKING THAT'S IN THE BEAD BREAKER AREA MAY BE EXPOSED TO BREAKING OR DAMAGE BE AWARE OF THE FAST MOVING ELEMENTS OF THE BEAD-BREAKER SYSTEM.
  • Page 7: Installation

    INSTALLATION When unpacking the machine check that it has not been damaged during transport and that parts and accessories are not missing. Insert the appropriate plug into the device, the plug must be three-phase, the four cells should contain these 3 phases + 1 neutral wire. After connecting to the power supply the machine is ready for operation.
  • Page 8: Electric Diagram

    ELECTRIC DIAGRAM 3 PHASES 1 - 0 - 2 1 PHASE...
  • Page 9: Operations And Use

    OPERATIONS AND USE 1. Opens the lock on the mounting head and allows it to be lifted. 2. Disconnects the mounting head and allows it to fall off. 3. Locks the mounting head and prevents it from moving in all directions.
  • Page 10: Maintenance

    DURING MOUNTING/DEMOUNTING WHEN THE TYRE SPLINKS, HOLD THE PEDAL UP AND ADJUST THE TYRE. MAINTENANCE UNI-TROL is not responsible for claims resulting from the use of non-original parts or accessories. Before carrying out any adjustments or maintenance to the machine disconnect the power supply and check that all moving parts are properly secured.
  • Page 11: Technical Service And Warranty

    JAWS SYSTEM Clean the jaw system regularly with compressed air. Lubricate and clean the machine regularly and on time. During the lubrication process keep the tools away from dust and water, do not lubricate unnecessary parts with oil. TECHNICAL SERVICE AND WARRANTY •...
  • Page 12: Service Notes

    SERVICE NOTES FAULT POSSIBLE CAUSES TROUBLE SHOOTING The fuses are blown when you press Short circuit of the motor power cable to Check the wires the table rotation pedal ground. Short circuit in the motor The table rotation pedal does not return Broken pedal spring Replace the spring to the center position...
  • Page 13: Machine Diagram

    MACHINE DIAGRAM 11TÝ 20 000...
  • Page 16: Spare Parts List

    48 00 000 PLUS MAIN BODY 93 00 004 RIGHT LOWER CAP 93 00 003 RIGHT UPPER CAP 93 00 008 MANAGER SQUARE MILE UPPER CAP 93 00 009 PILLAR LOWER ABS 93 00 010 MANAGER SQUARE ABS 01 0073 025 BOLT...
  • Page 17 SPARE PARTS LIST Number CODE DESCRIPTION V – BELT 01 0013 0650 72 00 001 MOTOR PULLEY GROUP 01 0115 008 01 0062 025 BOLT 01 0139 022 MILE SEGMENT 01 0082 025 BOLT 01 0052 107 RUBBER TYRE CHANGER BEAD BREAKER 01 0031 37 ARM PULLING SPRING 01 0117 016...
  • Page 18 SPARE PARS LIST Number CODE DESCRIPTION 01 0031 139 BEAD BREAKER PEDAL PULLING SPRING 01 0122 010 SETSCREW 11 12 010 PLASTIC PEDAL 01 0072 035 BOLT 01 0072 020 BOLT 91 05 012 DISTANCE GAUGE MILE 91 05 006 POWER SWITCH SPRING CAP METAL SHEET 72 02 002 BOLT...
  • Page 19 SPARE PARTS LIST Number CODE DESCRIPTION 01 0014 63 IPD RECORD 01 0014 92 RECORD 11 12 005 RECORD 01 0024 008-4 O-RING 11 12 004 RECORD 01 0153 1-4SN RECORD 01 0014 14 RECORD 11 00 022 TRADLE LINK BOLT 11Tİ...
  • Page 20: Pneumatic

    Account : for EURO : ALIOR BANK SA for EURO: no. PL 96 2490 0005 0000 4600 4784 6179 (swift code: ALBPPLPW) EU Declaration of Conformity in accordance with directives : 2006/42/EU, 2014/35/EU, 2014/30/EU and 2014/68/EU Uni-trol Co. Ltd. We : Ul. Estrady 56 01-932 Warsaw...
  • Page 21 PN-EN ISO11202:2012P Acoustics -- Noise emitted by machinery and equipment -- Determination of emission sound pressure levels at a work station and at other specified positions applying approximate environmental corrections PN-EN ISO 4871:2012P Acoustics -- Declaration and verification of noise emission values of machinery and equipment PN-EN 50419:2008P Marking of electrical and electronic equipment in accordance with Article 11 (2) of Directive 2002/96/CE (WEEE) The technical documentation of this device, referred to in point 1 of Annex VII A of the Machinery...

Table of Contents