Installation Sequence; Tips For The Operation Of The Tilting Davit; Get Familiar With Your Davit - 1st-Relief 1st23VCTILTSIB Manual

Tilting davits
Table of Contents

Advertisement

Manual
3.5

Installation Sequence

Basic Steps for Tilting Davit Installation:
1. Measure total length of dinghy and outboard combined.
2. Locate the dinghy side to side centring on platform (be sure the outboard does not
overhang the platform)
3. Locate the aft davit/deck plates by following the dimensions shown.
4. Locate the fore davit/deck plates by following the dimensions shown.
5. Complete the deck plate installation to the platform by drilling a hole (slightly larger than
deck plate base) at the centre of each deck plate location shown below then attach using
#10 through bolts/backing plates or washers.
4

Tips for the operation of the tilting Davit

4.1

Get Familiar with your Davit

,
Upper davit arm
(tilts)
Lower davit arm
(fixed)
Hitch Pin/lock,
ring/lynch pin
Figure 9 Hitch Pin/lock
FN:
552603b (LG f. ZRS Graz)
VAT No.:
ATU76757859
Figure 8 Davit Parts
page 8 of 11
Bank:
RB Graz-Mariatrost
Swift/BIC:
RZSTAT2G223
IBAN:
AT08 3837 7000 0420 9185
Adjustable Bunks
(1st23VCTILTRIB2
model only)
Threaded Deck
Plates
Bolts/Split
Washers/Flat
Washers
Handbuch VC Tilting Davits EN 1_3.docx
1st-Relief GmbH
Schulgasse 5
8010 Graz, Austria

Advertisement

Table of Contents
loading

Related Products for 1st-Relief 1st23VCTILTSIB

This manual is also suitable for:

1st23vctiltrib21st23vctiltribw

Table of Contents