Download Print this page

Sharp EL-1607P Service Manual page 5

Hide thumbs Also See for EL-1607P:

Advertisement

(5) Wiring of the secondary side of the transformer
Pass the lead wire of the secondary side of the transformer through the
slit section of the rib on the upper cabinet, and attach UL tape to the slit
section to fix the lead wire.
Attach UL tape to keep the
lead wire inside the groove.
Cross section of the lower cabinet
UL tape
Upper cabinet
(6) Protection tube
(6)-1. EL-1607P (AAC, ACO, ABC)
Insulate between the transformer and the AC cord connector with pro-
tection tubes (2 pcs u 2 positions).
Protection tube (2 pcs)
Protection
tube (2 pcs)
(6)-2. EL-1607P (TRC)
The EL-1607P (TRC) uses 14 protection tubes in total (that is, 2 pcs u 7
positions) as shown bellow.
[VOLTAGE SELECTOR]
Protection tube
(Heat contraction tube)
2 pcs/position
5 positions
Rib
Lead wire
Lead wire
Transformer
Protection tube
(One: Outside)
Protection tube
(One: Inside)
Use two protection tubes at
every one position.
EL-1607P Servicing
[FUSE HOLDER]
Protection tube
(2 pcs)
Protection tube
(2 pcs)
( 7) Ferrite core
(for EL-1607P (AAC, ACO, ABC))
• • •
(7) -1.
Wind the AC cord around the ferrite core so that the size is as shown in
the figure below.
Wind every AC cord three times around the ferrite core.
40mm
(7) -2. Fix the ferrite core to the cabinet
Fix the ferrite core by hot melt as shown in the figure below.
– 5 –
Fuse
holder
A
Transformer side 3
A-A'
cross sectional view
A'

Advertisement

loading

This manual is also suitable for:

El-1607paacEl-1607pacoEl-1607pabcEl-1607ptrc