CATCHPOLE & RYE The Mercantile Ladder Installation Manual

Advertisement

e Mercantile Ladder Towel Rail
STANDARD, DUAL FUEL & ELECTRIC MODELS

YOU WILL NEED

- Pair of Radiator valves for Dual Fuel or Standard Models (sold separately).
- Screwdriver
- Pipe Cutter
- Spanner
- 15mm Olive
- Suitable PTFE Tape

GENERAL INFORMATION

This product is manufactured entirely in the UK and has been rigorously tested to provide many years of good service when
installed by a suitably qualified professional.
All products must be thoroughly inspected once upon delivery and again prior to installation. Carefully remove the product packag-
ing for the initial inspection and repackage if being stored. It should be stored in a clean dry and safe environment at normal room
temperature.
Please read these instructions carefully before commencing any work and ensure that all parts are present and in perfect condition
before starting the installation.
If you require assistance or have any questions please call our Technical department: 01233 840 840
or email: technical@catchpoleandrye.com.
3
2
PHONE: +44 1233 840 840
EMAIL: INFO@CATCHPOLEANDRYE.COM
ADDRESS: CATCHPOLE & RYE, SARACENS DIARY, ASHFORD, KENT, TN27 0SA
INSTALLATION GUIDE
1
4
5

COMPONENTS

1. Pre Assembled Towel Rail
2. Radiator Valve Body x2
3. 1 1/2" Fixing Screws
4. 15mm Olive
5. Telescopic Shroud
©COPYRIGHT 2021 CATCHPOLE & RYE.
ALL RIGHTS RESERVED.
WWW.CATCHPOLEANDRYE.COM

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the The Mercantile Ladder and is the answer not in the manual?

Questions and answers

Summary of Contents for CATCHPOLE & RYE The Mercantile Ladder

  • Page 1 INSTALLATION GUIDE e Mercantile Ladder Towel Rail STANDARD, DUAL FUEL & ELECTRIC MODELS YOU WILL NEED - Pair of Radiator valves for Dual Fuel or Standard Models (sold separately). - Screwdriver - Pipe Cutter - Spanner - 15mm Olive - Suitable PTFE Tape GENERAL INFORMATION This product is manufactured entirely in the UK and has been rigorously tested to provide many years of good service when installed by a suitably qualified professional.
  • Page 2 INSTALLATION GUIDE e Mercantile Ladder Towel Rail STANDARD, DUAL FUEL & ELECTRIC MODELS SECTION 1: Wall Fixings - Applies to all models After the towel rail has been thoroughly inspected and Ensure that there are no wires or pipes behind the marked carefully unpackaged measure the fixing points on the wall locations for the fixings.
  • Page 3 INSTALLATION GUIDE e Mercantile Ladder Towel Rail STANDARD, DUAL FUEL & ELECTRIC MODELS SECTION 2: Connecting to power supply - Applies to Electric and Dual Fuel Models. Thread electric supply cable through the hollow leg and Attach the rail to the wall using the fixings inserted in section attach to the element.
  • Page 4 INSTALLATION GUIDE e Mercantile Ladder Towel Rail STANDARD, DUAL FUEL & ELECTRIC MODELS SECTION 3: Connecting to central heating systems - Applies to Standard and Dual Fuel Models. Ensure that the 15mm feed pipes are aligned correctly for Fit the radiator valve tail thread using an appropriate allen fitting to the radiator valves.
  • Page 5 INSTALLATION GUIDE e Mercantile Ladder Towel Rail STANDARD, DUAL FUEL & ELECTRIC MODELS SECTION 3: Connecting to central heating systems - Applies to Standard and Dual Fuel Models. Attach the feed pipes to the radiator valves using the Position the escutcheon and pipe cover so that they are in compression olives and nut.

Table of Contents