CGOLDENWALL CC-300 User Manual

Commercial self-draining steam generator

Advertisement

CGOLDENWALL
Commercial Self-Draining
Steam Generator
USER MANUAL
1

Advertisement

Table of Contents
loading

Summary of Contents for CGOLDENWALL CC-300

  • Page 1 CGOLDENWALL Commercial Self-Draining Steam Generator USER MANUAL...
  • Page 2 Preface Thanks for using CGOLDENWALL steam generator. The steam generator has stable function and beautiful appearance, uses the international advanced technology. To install, operate and maintain the machine safely and correctly, please read the instructions carefully and keep this manual for further reference.
  • Page 3: Table Of Contents

    CONTENTS Parameters..................4 Instructions for Installation...............5 Steam Generator Location..............6 Water Inlet pipe.................8 Steam Outlet pipe................9 Drain pipe and Auto drain valve............10 Steam Nozzle...................10 Wiring Connection................12 Controller Install Guide..............15 Temperature Probe Install..............17 Start the steam generator..............18 Controller Operation Guide...............18 Descaling....................20 Maintenance operation guidance............20 Troubleshooting Guidance ..............22...
  • Page 4: Parameters

    17.8×7.9×12.6 220/2 17.8×7.9×12.6 220/2 17.8×7.9×12.6 10.5 220/2 19.7×8.7×15.4 380/3 19.7×8.7×15.4 380/3 19.7×8.7×15.4 380/3 19.7×8.7×15.4 2.The basic parameters and dimensions of the controller are shown in Table 2: Table 2 Model Time/min Temperature Range Size(length*width*height)/in CC-300 30~720 95 - 131℉ 3.4*3.4*0.5...
  • Page 5: Instructions For Installation

    Instructions for Installation When installing the steam generator, please note that it has been carefully assembled and tested by our technician. The pipe installation must be in accordance with the specifications. Or consult a professional with local or national plumber qualification certificate for installation. Please turn off power when installing the steam generator and confirm whether the purchased model is suitable for your shower room.Please refer to Table 3.
  • Page 6: Steam Generator Location

    Steam Generator Location Select a location as near as practical to the shower room. Typical locations include: closet, vanity cabinet, climate controlled attic or basement. 1.Locate the steam bath generator within 32 feet of the shower room.The standard length of the cable for connecting the control to the steam generator is 32 feet.
  • Page 7 hot place or a place that may be frozen or corroded. At the same time, it is strictly forbidden to install it near flammable and explosive places such as paint, thinner, gasoline, etc. Should be placed in a dry and ventilated place.
  • Page 8: Water Inlet Pipe

    Pipe installation The installation of water supply pipes and steam pipes should be completed before sealing the wall. 1. Water inlet pipe: the water inlet pipe is connected with the DN15 pipe (1/2 NPT). And a DN15 metal hose is connected to the water inlet and water supply valve of the machine.
  • Page 9: Steam Outlet Pipe

    2. Steam outlet pipe(1/2’’ NPT): The steam pipe should be installed with a metal pipe of corresponding diameter or other materials with a high temperature resistance above 150 ° C according to the steam port of the steam engine (Since the ferrous metal and galvanized pipes will make the walls of the shower room rusty and discolored, so they are strictly forbidden to use it).
  • Page 10: Drain Pipe And Auto Drain Valve

    3. Drain pipe and Auto drain valve ( 1 ⁄ 2’’ NPT) The Auto drain System feature automatically drains the system following each use.The auto drain is automatically turned on after the controller is turned off for about 15 minutes, but it must be ensured that the main power supply is not turned off.
  • Page 11 Note: The steam nozzle should be 30cm high from the ground or 20cm high from the edge of the bathtub. For the comfort of the shower, the nozzle should be installed as far as possible from the seating area. After completing the pipe installation, the electrician can carry out the machine wiring work.
  • Page 12: Wiring Connection

    ● The steam pipe entrance, all other entrances and gaps should be sealed to prevent steam seepage and damage the machine and other objects. ● Draining the water in the water tank into the shower room may cause scalding accidents and damage the building materials used in the shower room.
  • Page 13  If you are in other 220V countries, you need to connect to one 220V live wire and one neutral wire (L and N). For both, a ground wire is needed. L1, N1, Ground to be field wired...
  • Page 14 When installing the steam generator, please note that it has been carefully assembled and tested by our technician. The pipe installation must be in accordance with the specifications. Or consult a professional with local or national plumber qualification certificate for installation. Please turn off power when installing the steam generator and confirm whether the purchased model is suitable for your shower room.
  • Page 15: Controller Install Guide

    3. Choose the voltage connected to the steam generator (i.e. 220V or 380V). The neutral wire of the 380V steam generator and the live wire cannot be connected wrongly, that is, the neutral wire cannot be connected to the live wire. Otherwise it will damage the circuit board and the heating tube.
  • Page 16 Temperature Sensor Installed at the height of 1.5 m of shower room Controller can be installed inside and outside the shower room 2. Installation of controller: The controller can be installed inside and outside the shower room. For ease of use, it is recommended that the controller be installed at a height of 1500 mm above the ground.
  • Page 17: Temperature Probe Install

    Installation of temperature probe The temperature probe senses the temperature in the shower room. Its installation height is about 1.5 meters and should be fixed in the shower room with screws. One head of the temperature probe line connect to the control panel.Another head of the temperature probe with sensor must be fixed inside the shower room by screws,and on a vertical surface, 4-5 inch above the floor and should be exposed to the air.
  • Page 18: Start The Steam Generator

    Do not locate the probe above or near the steam head or direct steam emissions. The probe is 10ft cable. Ensure that the probe and controller are located accordingly. IMPORTANT NOTE: Do not strain, staple, pinch, otherwise damage the probe cable. Start the steam generator After confirming that the pipes and circuits are installed correctly, you could open the water valve and turn on the power switch.
  • Page 19 3. On/Off: Press this key to start working and steam will be generated after a few minutes. Press this key again to stop working. The machine's internal working time is set to 60 minutes, and it will automatically shut down after the set time; 4.
  • Page 20: Descaling

    Descaling 1. The equipment is equipped with automatic drain valve to clean the incrustation scale in the steam generator. Clean process: Add 50g citric acid, turn off the power for about 2 hours, and let the citric acid dissolve. Turn the power back on after 2 hours. Finally, turn off the controller to start self-draining.
  • Page 21 whether the electric heating pipe is leaking, and cover the front cover and the electric heating pipe channel outer cover. 2. Replace the circuit board: Turn off the power and open the front cover. Please pay attention to the water level probes corresponding to the blue and white water level probes. Then remove the probes and the three wires on the circuit board.
  • Page 22: Troubleshooting Guidance

    Troubleshooting Guidance There are no user-operable parts in the machine. The maintenance must be carried out by qualified professionals. If you need more services or need the help of a service person authorized by the manufacturer, please contact the seller. Failure 1: Controller displays "00"...
  • Page 23 Failure 3 : Indicator lights on circuit board excludes the troubles Red light: power. if the red light are not on, the machine is not receiving power, please kindly check the wiring connecting and power Green light: working. If the green light are not on, the machine is not receiving working Yellow light: heating.

Table of Contents