TABLE OF CONTENTS SAFETY AND WARNINGS • Before You Begin GAME SETUP AND FEATURES • Introduction • Game Play and Player Controls • Assembly - see insert • Programming - see insert MAINTENANCE • Power Supply & Transformer • AC Main fuse •...
SAFETY AND WARNINGS BEFORE YOU BEGIN WARNING: WHEN INSTALLING THIS GAME, A GROUNDED A.C. RECEPTACLE MUST BE USED. FAILURE TO DO SO COULD RESULT IN INJURY TO YOURSELF OR OTHERS. FAIL- URE TO USE A GROUNDED RECEPTACLE COULD ALSO CAUSE IMPROPER GAME OPERA- TION, OR DAMAGE TO THE ELECTRONICS.
NFL™ incorporates both pop out targets as well as stationary targets that are user friendly and realistic. Fun and easy to play for players of all ages, yet challenging enough for even the ex- pert football players.
Maintenance Power Supply & Transformer The power supply and transformer are located in the back of the game. To access them, you must open the bottom back access door and located on the left is the power assembly. See pictures below DA2001X F3 = 4 amp slow F1 &...
Maintenance General illumination Location of bulbs There are two 8545’s (Compact fluorescent bulbs) located in the control panel, one E00377 (Flood Bulb) and located above the Playfield area is one 8312 (PLL 18 bulb). (1) 8312 (PLL) (1) E00377 (Flood) (2) 8545 (Curly) Control panel bulbs To access the three bulbs located in the control panel you will need to remove the...
Maintenance Display Board locations Control panel display boards are located below. FB2032X is a display that includes six display boards and five mini footballs. See picture below. START ICE part numbers [1] CB2232X [2] CB2233X [3] FB2032X [4] FB2033X [5] FB2035RX [6] FB2035WX [7] FB2035BX [8] DA2133X...
Maintenance Target Covers To access the target motors you will need to remove the display housing. You also will need to ensure the targets are protruding out as shown below. Unlatch the harness clamps located in the back side of the game first. Remove the four mounting screws at the bottom back of the game in order to gain access to remove the back door.
Maintenance Conveyor Assembly Access To access the conveyor assembly you will need to remove the side wall panels. It is not necessary to remove the target covers in order to remove the side wall panels but to ensure that they are not scratched it is recommended. Refer to page 15 on how to remove target covers.
Spare Parts Listing Electronics: FB2002X Isolation Transformer (for TUV games) 1029WSX ASY RESET BUTTON 8992FBAX ASY (CLEAR LED STRIP for control panel) 8992FBX ASY (CLEAR LED STRIP for game clock) AR2007 6X9 SPEAKER BB2022X ASY FLOOD LAMP SOCKET CB2232X PCBA (DISPLAY) CB2233X PCBA (DISPLAY) CS8449X...
Page 47
FRONT TARGET PAD FB4003 REAR DOOR FOAM PAD FB7011 NFL BLACK SCRIM VINYL RR5001-P802 COIN DOOR (TRIPLE) SINGLE MECH Black RR5001-P200 COIN DOOR (TRIPLE) SINGLE MECH Orange Gloss RR5001-P901 COIN DOOR (TRIPLE) SINGLE MECH Gold Metallic RR5001-P903 COIN DOOR (TRIPLE) SINGLE MECH Powder Gray...
NFL 2 Minute Drill ASSEMBLY GUIDE Production Game Rev C 2/8/2008...
Page 50
Overview: Please review assembly instructions before beginning assembly. It will be necessary to have at least two people to assemble this game. Step 1: With two people position the upper rear and conveyer base as shown in below. Slide the two halves together and latch the halves with the provided tool found in the cash box.
Page 51
Step 3: Connect the upper rear section harnesses to the main board. All wire connectors are labeled and connect to the same labeled connections found along the side of the main board. See example of label below. Attach the excess cabling into the two ca- ble straps mounted on the right side of the cabinet.
Page 52
Step 5: Loosen the 3 hat nuts mounting the control panel shown on step 7 before positioning the cages. Position the side cages onto the cabinet and install (7) 1/4-20 bolts (use 5/32 Allen) and (7) 1/4-20 inserts (use 3/16 Allen) as shown in picture 4a and arrow drawing below. You will have to climb into the cabinet to install the side cages.
Page 53
Marquee Install The marquee can be installed for two or more games. It is recommended to place the mar- quee as close to the center of the games as possible. See diagram below for location of mounting bolts. Game software installed must be version 3.0 or greater for marquee to communicate with game.
Page 54
Section Diagram The game is manufactured in three sections. Here is a diagram with the sections la- beled for identification during assembly. Control Panel Upper Rear Section Conveyer base Front Section Section Spares package includes the following: Ice Part Description 3052 Black hole plug 6001B...
Page 55
NFL 2 Minute Drill PROGRAMMING GUIDE SOFTWARE VERSION Production 3.00...
Page 56
Programming Description To enter programming, open the coin door and press the button labeled “PROG” which is on the left. The display “credits” will show which option you are on. The display “Total Yards” will show the current value. No other displays will update until you exit programming. Press the select but- ton to cycle through options and press the advance button to change the value.
Page 57
Error Code Description When your game is powered on it will run some self tests to determine the functionality of the game. If any errors occur, then game will display the error and wait until it is cleared. The game will not proceed until the error is fixed.
Page 58
GAME CLOCK POWER CORD red x 2 BLACK & black black x 2 black BLACK x 2 RED & red LED STRIP #8992FBX GREEN BROWN black black 8453 PP250X WHITE LED STRIP #8992FBX BALLAST DISPLAY BOARD POWER ENTRY MODULE FB2007X BLACK BROWN FB2033X...
Need help?
Do you have a question about the 2 MINUTE DRILL and is the answer not in the manual?
Questions and answers
Need printed manual