Salsbury Industries S-54000 Series Installation Instructions

Wide see-through lockers

Advertisement

15" Wide See-Through Lockers – S-54000 Series
Thank you for selecting Salsbury's 15" wide see-through four tier lockers. These instructions are intended to assist you in assembling the lockers. Assembly of the various locker
components will be with #10 - 24 x 3/8" long slot less screws and #10 nuts (provided). Loosely fasten a screw and a nut into every set of mating holes with the screw heads positioned on
the outside of the locker or on the exposed surface.

One Wide Locker Assembly

Step 1: Attach the top shelf and bottom shelf to the back panel.
Step 2: Turn the back panel on its back with the shelves pointing upward. Attach the
first side panel, the left rear leg, and three compartment dividers to the assembly from
Step 1.
Four Tier Installation Instructions
Step 3: Attach the second side panel and the right rear leg to the assembly of Step 2.
The locker chassis is now complete.
Step 4: Attach the pre-assembled door frame onto the assembly of Step 3.
Step 5: Tighten all fasteners checking for squareness of the locker while tightening.
Attach optional sloping hood, end bases or front base (see pages 4 and 5).
Step 6: Place the locker in the installed location and anchor to the floor, wall, or to
both. Individual job conditions will dictate the type of fastening anchors to use (not
provided).
Step 7: Fasten all lockers in a row together by installing fasteners provided through
the side panels. Installation is now complete.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S-54000 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Salsbury Industries S-54000 Series

  • Page 1 15" Wide See-Through Lockers – S-54000 Series Four Tier Installation Instructions Thank you for selecting Salsbury’s 15" wide see-through four tier lockers. These instructions are intended to assist you in assembling the lockers. Assembly of the various locker components will be with #10 - 24 x 3/8” long slot less screws and #10 nuts (provided). Loosely fasten a screw and a nut into every set of mating holes with the screw heads positioned on the outside of the locker or on the exposed surface.
  • Page 2 15" Wide See-Through Lockers – S-54000 Series Four Tier Installation Instructions Step 3: Attach the second top shelf and the second bottom shelf to the second back panel Three Wide Locker Assembly as in Step 1. Step 1: Attach the top shelf and bottom shelf to the back panel.
  • Page 3 15" Wide See-Through Lockers – S-54000 Series Four Tier Installation Instructions Three Wide Locker Assembly (continued) Step 8: Position the pre-assembled door frames onto the assembly of Step 7 then fasten one by one. Step 7: Attach the last side panel and the right rear leg to the assembly of Step 6.
  • Page 4 15" Wide See-Through Lockers – S-54000 Series Four Tier Installation Instructions Sloping Hood Installation (Optional) Step 3: Attach the sloping hood to the top of the locker with #10 - 24 x 3/8” slot less Step 1: Assemble the top panel to the rear panel with #10 - 24 x 3/8” slot less screws screws and #10 nuts (provided).
  • Page 5 15" Wide See-Through Lockers – S-54000 Series Four Tier Installation Instructions Front Base Installation (Optional) End Base Installation (Optional) Position the front base between the front legs of the locker with the flange upward. Position the appropriate end base (right or left) behind the corresponding side legs Assemble to the locker with #10 - 24 x 3/8”...

Table of Contents