Download Print this page

Advertisement

Quick Links

Steel Gazebo
Assembl
We are forever grateful and appreciative of you considering
purchasing our product. After careful evaluation of our product
serie, we are excited to launch this product to the public as it is
more technically advanced with lots of exciting and useful
features. One of the great features added to the arsenal is its
mere size, which will require 3-4 people with about 4-5 hours of
installing time. Making it a beast at its finest!
y Instruction
OB-HTG002(DA007-3)

Advertisement

loading
Need help?

Need help?

Do you have a question about the OB-HTG002 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Ainfox OB-HTG002

  • Page 1 Steel Gazebo Assembl y Instruction OB-HTG002(DA007-3) We are forever grateful and appreciative of you considering purchasing our product. After careful evaluation of our product serie, we are excited to launch this product to the public as it is more technically advanced with lots of exciting and useful features.
  • Page 2 Steel Gazebo Assembly Instruction...
  • Page 3 M6*30...
  • Page 5 STEP 3:Connect the Ionger Crossbeams Band B1 using Crossbeam Connector (Part P) Note: After sliding the Cro ssbeam Connector (Part P) into a crossbeam you should start one bolt to hold the Crossbeam Connector in place.
  • Page 6 STEP 5-1 STEP 5-1: Attach the Corner Protectors (Part J1) and the Rib Supports (Part J2) Just twist the top two screws of (Part J2) STEP 5-2 STEP 5-2: Slide 5 Netting Hooks (Part Q) into Long Crossbeams (Parts B and B1).With the sections laying on their side, Slide 4 Netting Hooks (Part Q) into Short Crossbeams (Parts C and C1).
  • Page 7 STEP 6 STEP 6: Assemble the Roof Frame by Attaching the Roof Ribs Long (Part E) to the Roof Top Brace (Part K1).
  • Page 8 STEP 7 STEP 8...
  • Page 9 STEP 9 Don't tighten all the screws, just hold the ( Part I and Part H) , until all of them are fixed Please note that Parts M3 are installed on Parts D, and Parts M4 are on Parts E. STEP 10 Tap lightly with the screwdriver...
  • Page 10 STEP 11 Step11 - 1 :Install the Roof Plates (Part N5 and N6) on the Long Sides of the Gazebo. Install the Roof Plates (Part O5) on the Short Sides of the Gazebo. Tighten the screw (part U) halfwy,then install(Part G5 G6), and finally tighten the (Part U) tep11 G5/G6...
  • Page 11 STEP 12 Step 12: Part N1 N2 N3 N4 for the Long Sides of the Gazebo, Part O1 O2 O3 O4 for the short Sides of the Gazebo. Install the Roof Plates on the Long Sides of the Gazebo. Start by sliding Roof Plate 1 (Part N2 and N3) into position.
  • Page 12 STEP 14 Note: First fix 4 (Part M2) with V, but do not screw too tight, then install (Part G1 G2 G3 and G4 )as shown in the diagram. You'd better from left to right. Attach the Center Rib Braces (PartM1) as shown in the diagram.
  • Page 13 STEP 15 Gently insert Z2, Z3, Z4 from left to right as shown, then tighten them via screws U1 and V.
  • Page 14 STEP 16...

This manual is also suitable for:

Da007-3