Inflation - Intex Quickfill AP619D Owner's Manual

Table of Contents

Advertisement

INFlATION

1. Open cord compartment cover and remove power cord. Do not yank on the cord.
See Fig (1).
2. Plug in the AC power cord into an AC electrical outlet. See Fig (2).
3. Turn the control dial fully clockwise until it stops. The pump turns on automatically to
inflate the airbed. See Fig (3).
4. When the airbed is fully inflated, turn the control dial back (counterclockwise) to the
center position which closes the valve and turns the pump off. See Fig (4).
NOTE: Turning the control dial either direction while the pump is unplugged will let air
escape from the airbed. See step #5 for firmness adjustment instructions.
Never disconnect the power cord from the electrical outlet while the pump is running. Rotate
control dial to the closed / pump off position before disconnecting the power cord.
5. If the airbed feels too firm, release some air by simply turning the control dial gradually
counterclockwise until air begins to escape from the air passage. When the desired
firmness is achieved, turn the control dial back to the center closed / pump off position. If
the airbed feels too soft, repeat steps #3 to #5 as necessary.
READ AND SAVE THESE INSTRUCTIONS
(17PO) AP619D/AP619DP-22 ELECTRIC PUMP ENGLISH 4.875" X 7.25" 12/04/2021
FIg (1)
Rotate to Closed / Pump Off Position
Page 3
220V – 240V
FIg (2)
Inflate
Position
FIg (3)
FIg (4)
English
17PO
110V – 120V

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Quickfill AP619D and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Quickfill ap619dpQuickfill plusAp619dAp619dp

Table of Contents

Save PDF