Assembly Instruction for Impact Vibrators with Electromagnetic Drive (Translation of the original assembly instruction) Series SR…...
Page 2
................................................................................This assembly instruction refers to AViTEQ impact vibrators of the series SR… that are operated with an AViTEQ magnetic vibrator. Impact vibrators shall improve the emptying of hoppers that are filled with bulk materials and avoid plugging, caking, or bridging. This is achieved by directional shock pulses that stimulate the hopper wall, generated by the impact vibrator.
------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ Explosions can lead to perilous injuries and cause great damage to property! AViTEQ- impact vibrators of the series SR… must not be operated in areas with potentially explosive atmospheres consisting of a gas-, a vapour-, a mist- or a dust-air-mixture.
Page 4
................................................................................------------------------------------------------------------------------------------------------------------------------------------ Impact vibrators should only be operated periodically to avoid compacting the bulk material inside the hopper. Further, only operate the impact vibrator while the outlet of the hopper is opened and material can be discharged. The maximum shaking effect arises directly after switching on the drive.
................................................................................Installation Installation location and clamping area To assure an effective operation of the impact vibrator, please select the ideal installation location. Hoppers that tend to plugging or bridging normally show a good emptying, if the impact vibrator is mounted at about 1/3 of the height of the conical hopper (...see Figure 1).
Page 8
Prior to the first commissioning all installation works have to be carried out, as they are described in the previous chapter. ------------------------------------------------------------------------------------------------------------------------------------ AViTEQ delivers magnetic vibrators including the appropriate controllers. Before commissioning, please check that the magnetic vibrator is only operated with a matching controller!
................................................................................Maintenance We recommend the following checks in regular intervals as shown below: Test intervals Checks 2 operating hours - Check screw connections (impact vibrator/drive) after the first - Check the condition of the impact bolt and the impact plate commissioning - Check the discharge of material out of the hopper 24 operating hours...
Page 11
Appendix VII Part B and to transmit these on request in electronic form to the responsible national authorities. The associated address is: AViTEQ Vibrationstechnik GmbH, Mr. Adrian Beilfuss, Im Gotthelf 16, 65795 Hattersheim, Germany.