Download Print this page

AviteQ SR Series Assembly Instruction Manual

Impact vibrators with electromagnetic drive

Advertisement

Quick Links

Assembly Instruction for Impact Vibrators
with Electromagnetic Drive
(Translation of the original assembly instruction)
Series SR...

Advertisement

loading
Need help?

Need help?

Do you have a question about the SR Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for AviteQ SR Series

  • Page 1 Assembly Instruction for Impact Vibrators with Electromagnetic Drive (Translation of the original assembly instruction) Series SR…...
  • Page 2 ................................................................................This assembly instruction refers to AViTEQ impact vibrators of the series SR… that are operated with an AViTEQ magnetic vibrator. Impact vibrators shall improve the emptying of hoppers that are filled with bulk materials and avoid plugging, caking, or bridging. This is achieved by directional shock pulses that stimulate the hopper wall, generated by the impact vibrator.
  • Page 3: For Your Safety

    ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ Explosions can lead to perilous injuries and cause great damage to property! AViTEQ- impact vibrators of the series SR… must not be operated in areas with potentially explosive atmospheres consisting of a gas-, a vapour-, a mist- or a dust-air-mixture.
  • Page 4 ................................................................................------------------------------------------------------------------------------------------------------------------------------------ Impact vibrators should only be operated periodically to avoid compacting the bulk material inside the hopper. Further, only operate the impact vibrator while the outlet of the hopper is opened and material can be discharged. The maximum shaking effect arises directly after switching on the drive.
  • Page 5: Device Specification

    The operating magnetic vibrator generates a linear movement of the impact bolt (4). During operation the impact bolt hits against the impact plate (5) and generates a shock pulse that is transmitted into the hopper wall the impact vibrator is tightened to............................................................................/ 12 © 2012 AViTEQ Vibrationstechnik GmbH Version 08/2012...
  • Page 6: Installation

    ................................................................................Installation Installation location and clamping area To assure an effective operation of the impact vibrator, please select the ideal installation location. Hoppers that tend to plugging or bridging normally show a good emptying, if the impact vibrator is mounted at about 1/3 of the height of the conical hopper (...see Figure 1).
  • Page 7 Damage to property and/or person can be the result! ------------------------------------------------------------------------------------------------------------------------------------ Loctite is a trademark of the company Henkel KGaA............................................................................/ 12 © 2012 AViTEQ Vibrationstechnik GmbH Version 08/2012...
  • Page 8 Prior to the first commissioning all installation works have to be carried out, as they are described in the previous chapter. ------------------------------------------------------------------------------------------------------------------------------------ AViTEQ delivers magnetic vibrators including the appropriate controllers. Before commissioning, please check that the magnetic vibrator is only operated with a matching controller!
  • Page 9 (working stroke) that is just effective enough to achieve the desired effect. ------------------------------------------------------------------------------------------------------------------------------------ Did problems appear while commissioning or do you have any questions, give us a call. We’ll be glad to help you............................................................................/ 12 © 2012 AViTEQ Vibrationstechnik GmbH Version 08/2012...
  • Page 10: Maintenance

    ................................................................................Maintenance We recommend the following checks in regular intervals as shown below: Test intervals Checks 2 operating hours - Check screw connections (impact vibrator/drive) after the first - Check the condition of the impact bolt and the impact plate commissioning - Check the discharge of material out of the hopper 24 operating hours...
  • Page 11 Appendix VII Part B and to transmit these on request in electronic form to the responsible national authorities. The associated address is: AViTEQ Vibrationstechnik GmbH, Mr. Adrian Beilfuss, Im Gotthelf 16, 65795 Hattersheim, Germany.
  • Page 12 ................................................................................AViTEQ Vibrationstechnik GmbH Im Gotthelf 16 65795 Hattersheim Germany Phone …..………… +49 / (0) 61 45 / 5 03 - 0 Fax …………………. +49 / (0) 61 45 / 5 03 - 2 00 Fax …………………. +49 / (0) 61 45 / 5 03 - 112 (Service-Hotline) E-Mail ………………...

This manual is also suitable for:

Sr cSr d