Do you have a question about the B-PRIMIS ET-PRIME Series and is the answer not in the manual?
Questions and answers
Summary of Contents for BERGHOF B-PRIMIS ET-PRIME Series
Page 1
USER MANUAL 1.1 B-PRIMIS ET-PRIME Series...
Page 2
Subject to technical modifications. Trademarks → CANtrol®// is a registered trademark belonging to Berghof Automation GmbH. → Microsoft®, Windows® and the Windows® logo are registered trademarks belonging to the Microsoft Corp. in the USA and in other countries.
Page 3
USER MANUAL 1.1 | B-PRIMIS ET-PRIME SERIES Change log Version Date Description 11.02.2020 first draft with new format and new numbers 05.06.2020 Prerelease 18.06.2020 Formatting of the document revised 13.10.2020 Address correction Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Non-compliance with the safety features will result in death or serious injury. Take preventive measures. WARNING Possible serious injury or death Non-compliance with the safety features may result in death or serious injury. Take preventive measures. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
The user takes direct responsibility for agreeing with the competent authorities the use of safety-related control components, and for compliance with their instructions Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
When installing the device, check that the seal profiles are undamaged. For operation, refer to the applicable statement of ambient conditions (see "Technical data"). Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
If you discover damage in transport, or if the equipment delivered does not match the or- der: Inform the supplier immediately. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Disconnect the device from the system. The casing of the device must not be opened. If work on the internal parts of the device is necessary, contact the manufacturer (see "Addresses"). Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
These terminals show the CODESYS Web visualisation or CODESYS Target visualisation, irrespective of whether the source of the visualisation isa Berghof PLC control unit or some other CODESYS control unit. The Ethernet Terminals B-Primis ET-Prime can be connected via Ethernet interfaces; the B- Primis DC-Prime Controllers can be connected via various different interfaces and in addition have their own digital and analogue inputs/outputs.
Power supply Function button (do not use this - only for use by Berghof Service En- gineers) unused unused USB 2.0 unused Ethernet (ETH0) µSD unused USB 2.0 Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
The max. ambient temperature inside the control cabinet must not exceed 55 °C in oper- ation. → The support material for the installation cut-out must be flat, sufficiently stable, and be from 1 to 3 mm thick. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Page 17
Cut a rectangular installation cut-out in the support material: Height: 123 mm Width: 186.4 mm Max. corner radius: 1.5 mm Optimum thickness of the support material: 1.0 mm to 3.0 mm Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
The max. ambient temperature inside the control cabinet must not exceed 55 °C in oper- ation. → The support material for the installation cut-out must be flat, sufficiently stable, and be from 1 to 3 mm thick. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Page 19
Cut a rectangular installation cut-out in the support material: Height: 163 mm Width: 242 mm Max. corner radius: 1.5 mm Optimum thickness of the support material: 1.0 to 3.0 mm Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Make sure that the mounting points of the device are all in a common plane, with no more than maximum ±0.5 mm variation. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Page 21
Cut a rectangular installation cut-out in the support material: Height: 231 mm Width: 377.8 mm Max. corner radius: 1.5 mm Optimum thickness of the support material: 1.0 mm to 3.0 mm Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
If installation is performed carelessly the device can fall out of the installation cut-out or be damaged. Do not tilt the device. Restrain the device against falling until the securing clips have been tightened. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Page 23
Insert the other securing clips and tighten the screws in all the securing clips equally (max 35 Ncm). ET-Prime 15: 14 securing clips ET-Prime 10: 8 securing clips ET-Prime 10: 8 securing clips Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
All connections and cables must be laid so as to prevent inductive and capacitive interfer- ence causing any damage to the device. Ensure that the infeed lines provide adequate current and voltage carrying capacity. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
B-Primis ET-Prime 15: max. 0.7 A (peak current 1.2 A) The following counterparts have been tested for the S2C-SMT 3.5 (Weidmüller) plug-in con- nector and are approved for use with the device: → B2CF 3.50/12/180 Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Meaning to IEEE 802.3 clause 25 LNK/RCV green Link, Data Receive Flashing: connection active; data transfer in progress Off: no connection established SPEED yellow On = 100 Mbit/s Off = 10 Mbit/s Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Use only USB devices that have no direct connection between signal earth and the housing. The USB interface plug is designed to withstand 1,000 plugging and unplugging cycles. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
The device does not have an on/off switch. The device starts automatically when the system is switched on or the power is connected. Switching off The device is switched off when the system is switched off or the power supply is discon- nected. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
After the start the current network settings are displayed (server IP, IP address and net- work mask). Fig. 15: Start page, with network settings Press the “Configuration” button. A page with further information appears. Fig. 16: Information page Press the “Next” button. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Page 31
Press the "Expert” button to change the Lifeguard setting. The page with the Expert settings will appear. – or – Press the "Next” button and skip to the following page. Fig. 19: Changing the Lifeguard setting Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
The page with the network settings of the device appears. Press the "Expert" button and then press the "Change" button to switch the device into a web terminal. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Page 33
The settings will be saved and the device will restart automatically. After the restart, the device starts its integrated browser and automatically loads the configured URL setting of the visualization. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
As long as the Run/Stop LED flashes yellow: the device is in use and must not be switched off. The device does not show warnings via the LEDs during start-up. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com...
Insert or remove a microSD card only when the device is switched off. The microSD interface is not supported in the ET-Pro series! Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Check the network settings on the PC: The subnet and the subnet mask settings must be the same as those for the controller. Check the firewall / anti-virus programs on the PC. Check the Lifeguard settings. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
To avoid faults due to inadvertent activation, switch the device off before cleaning the front panel. Clean the surfaces using only a dry, lint-free cloth. Clean the glass only with normal window-cleaning agents or alcohol solutions. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Undo the screws on all the securing clips equally. ET Prime 15 : 14 securing clips ET Prime 10: 8 securing clips ET Prime 7: 6 securing clips Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Page 39
Fig. 25: Removing the securing clips Removing the securing clips. Fig. 26: Pushing the device out of the installation cut-out Push the device evenly forwards out of the installation cut-out. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Dispose of the electronic scrap in accordance with the national laws and regulations. Check that the battery is fully discharged. Dispose of the battery in accordance with the national laws and regulations, via an au- thorised collection point. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Transport and storage –20 °C to +70 °C Operating temperature Relative humidity max. 85%, non-condensing Operation Installation Removable securing clips Certification to product standards EN 61010-2-201, EN 61131-2 Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Page 42
1x 10/100 Base T Connection system RJ45 Protocols TCP/IP USB interface No. / type of interface 2x host USB 2.0 / USB plug port A No. plugging/unplugging cycles max. 1,000 Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Order no./Article no. Version Date of manufacture (year/week) CE mark Supply voltage and max current con- Disposal instruction sumption Manufacturer’s address Manufacturer’s logo QR code (Identification no.) Mac addresses Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
BLZF 3.50/02/180) H100 UL zertifiziert For more detailed and up-to-date information on the options available for this device, please refer to the product catalogue or the homepage. Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Programmable Logic Controllers, part 2: Equipment requirements and tests EN 61131-2 → Safety provisions DIN EN 61010-2-201 → Technical documentation for assessing electrical and electronic equipment in respect of re- striction of hazardous substances EN 50581:2012 Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Products ➔ Controllers / PLC ➔ Display PLC ➔ Capacitive ➔ Product On each product page there is a link for downloading the declaration of conformity: Fig. 28: Download menu of Berghof Homepage Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | www.berghof-automation.com B-PRIMIS_ET-PRIME_EN_1.1.docx...
Page 48
Mozilla Public License (MPL) → FreeType License (FTL) The source code of the free software may be requested from Berghof Customer Service within three years of delivery of the device, at cost price. 13.2. List of figures Fig. 1: Overview B-Primis ET-Prime 7/10/15 (rear view)..............14 Fig.
Need help?
Do you have a question about the B-PRIMIS ET-PRIME Series and is the answer not in the manual?
Questions and answers