building. Jacuzzi Europe refuses all responsibility for any
damage caused by excessive humidity. Consult a spe-
cialist for indoor installation.
I
Minipool
The spas of the "Experience" range can also be installed
recessed with the tub edge flush with the floor. Refer to the
drilling template shown in
In any case, keep in mind that the spa-pak and the compen-
sation tank must be placed at a lower level (
N.B. Since the sizes may vary slightly, always check the meas-
urements before installing the minipool.
Make sure that the hosing under the tub is accessible, for exam-
ple, by preparing a passage (
perimeter that is sufficiently wide (about 80 cm) to make oper-
ations easy. This passage can be closed using removable under-
frames (detail 3), with suitable supports (detail 4). Drainage for
any water stagnation must also be provided (detail 5).
If it is to be floor-installed, it will be necessary to fill in the outer
perimeter of the tub, using removable panels all along the
perimeter. In any case, you will require a support base below the
tub bottom (in concrete, steel beams,
can use the metal supports provided to support the tub edge,
positioned as shown in detail 6. The realization of the support
base must take into account the position of the support feet (
1) and the load of the spa, taking into account the table
"Weights" shown above.
Study the routes and dig any necessary holes and channels for
the water and electric connections for the spa and the Spa-Pak,
with the compensation tank and the ground drainage points, tak-
ing into account that:
- the plumbing pipes are those shown in
placed so as to avoid siphons. This does not apply to the
blower, which does require a blower (
- 5 pneumatic push buttons are provided (
They should be installed near the spa and placed in an appro-
priate box (provided with the spa-pak; in can be wall-mount-
ed or installed under the tub
tic tubes (ø 6 mm) which are also provided. This box must
then be connected to the electrical box on the spa-pak by
means of a multi-polar normalized cable 6x0.75 mm
- the spotlight box of the spa (located under the tub) must be
connected to the electrical box on the spa-pak by means of a
normalized bi-polar cable 2x1.5 mm
- A cable track must also be provided for electrical connections
from the compensation tank to the electric wiring box on the Spa-
Pak (8 standard leads, with a minimum section of 1.5 mm
I
Spa-pak
The Spa-Pak can be installed near the tub and, in any case, at a
distance NOT EXCEEDING 6 METRES,
is because the shorter the hoses are, the smaller the loss of load
i
4.
i
2).
i
4, detail 2) around the outer
i
4, detail 1), while you
i
2 which must be
i
2 and 5, detail B).
i
2, detail 2).
i
2, detail 2a) using the plas-
2
.
i
5, detail 1: this
will be. We recommend that you avoid bends, as far as possible,
(we suggest you use flexible PVC hoses).
If the Spa-Pak has a heat exchanger for water heating, you will
need to connect the main circuit with the system that will provide
hot water, as well as the connection from the electric wiring box
to the devices (solenoid valve, electro-pump), which control hot
water re-circulation for the main circuit of the heat exchanger.
Water connections for the Spa-Pak must also include the con-
nection between the filter and a ground drainage point.
Spa-Pak must always be installed in a ventilated indoor
area, which is not accessible to persons without a key or
tools and it must be protected from water and bad
weather (see note "Spa-Pak and the compensation tank" in
the previous chapter).
For perfect operation of the system, the Spa-Pak must be
installed at the same level as the compensation tank (
detail 2) or with a minimal difference.
I
The compensation tank
When possible, it must be installed near the Minipool for optimum
efficiency (excess water will fall into the compensation tank).
For this, it is compulsory for the compensation tank to be
installed on a surface that is at least 50 cm lower than the
i
Minipool one, up to a maximum of 2 m (
If the compensation tank is installed outdoors, a suit-
able system must be provided to protect it from sunrays
and ultra-violet rays, to avoid damaging the container.

Electrical safety

The spas of the Experience range are safe products, manufactured in
compliance with standards EN 60335.2.60, EN 61000, EN 55014
and tested during production to ensure their safety.
I
Installation must be carried out by qualified and authorized per-
sonnel, in compliance with the national provisions in force.
It is the responsibility of the installer to choose the
materials in relation to their use, to carry the work out
2
.
correctly, to check the condition of the system to
which the appliance is to be connected and its suit-
ability and to guarantee safety when in use, regard-
ing maintenance operations and inspection of the
system.
I
The spas of the Experience range are class "1" appliances and
therefore they must be permanently connected, without any
2
).
intermediate connections, to the electrical system and to the
protection system (earth system).
The electric system of the building must be provided
with a 0.03A differential switch and an efficient pro-
tection circuit (earth).