Page 2
Instron 3365 Load cell switching guide 29/09/2020 This document is a quick reference guide for the switching of load cells on the Instron 3365 testing machine. It does not replace formal training. For any doubt or problem contact luca.ceseracciu@iit.it, tel.
Page 3
Rev. Instron 3365 Load cell switching guide 29/09/2020 3. Loosen the screw on top of the machine bar with the 8 mm hex key. Hold the cell from the bottom to avoid it fall! 4. Locate and remove the alignment ring and the anti-rotation pin 5.
Page 4
Rev. Instron 3365 Load cell switching guide 29/09/2020 7. Insert the cell in the machine bar. Look for the hole marked in green. 8. Tighten the top screw with the 8 mm hex key 9. Mount the clamp, following the steps 1 c, b, a.