Daikin DZ18VC Series Installation Instructions Manual page 33

Heat pump unit
Hide thumbs Also See for DZ18VC Series:
Table of Contents

Advertisement

8. Next, scroll down and select EQUIP TEST.
9. Select SYSTEM TEST.
10. Select ON to run the SYSTEM TEST.
Press DONE to initiate test.
11. Allow the system test to run for its duration
(5-15 minutes). EQUIP TEST SCREEN will
show the system test is ON once selected.
System test will operate the outdoor unit and the
indoor unit through a series of startup tests.
Please proceed to the next step and allow for
startup tests to complete. Do not interrupt power
to outdoor unit, indoor unit, or thermostat
during system test.
33
ON

Advertisement

Table of Contents
loading

Table of Contents