Seg  BMB-HV Series Installation Manual

Seg BMB-HV Series Installation Manual

Solar black photovoltaic module

Advertisement

Quick Links

2021 V3.0
SEG SOLAR BLACK PHOTOVOLTAIC MODULE
SEG SOLAR INC. (SEG)
ADD:
SEG Headquarter California office:
6200 Stoneridge Mall Rd., Ste 300 Pleasanton, CA 94588
SEG San Antonio, Texas office:
973 Isom Road San Antonio, TX 78216
T: 925-468-4198
W
E
: B
www.segsolar.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the SEG BMB-HV Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Seg SEG BMB-HV Series

  • Page 1 2021 V3.0 SEG SOLAR BLACK PHOTOVOLTAIC MODULE SEG SOLAR INC. (SEG) ADD: SEG Headquarter California office: 6200 Stoneridge Mall Rd., Ste 300 Pleasanton, CA 94588 SEG San Antonio, Texas office: 973 Isom Road San Antonio, TX 78216 T: 925-468-4198 www.segsolar.com...
  • Page 2: Purpose Of This Guide

    2 SAFETY 2.1 GENERAL SAFETY 2.2 HANDLING SAFETY INSTALLATION GUIDE 2.3 INSTALLATION SAFETY 2.4 FIRE SAFETY SEG SOLAR BLACK PHOTOVOLTAIC MODULE 3 PRODUCT IDENTIFICATION 4 MECHANICAL INSTALLATION 4.1 GENERAL INSTALLATION PRINCIPLE 4.2 LOCATION AND ANGLE SELECTION 4.3 SCREW INSTALLATION 4.4 CLAMP INSTALLATION 4.5 ELECTRICAL INSTALLATION...
  • Page 3 PHOTOVOLTAIC MODULE • Installers should assume all risk of injury that might occur during installation, including, but not limited to the risk of electric shock. Thank you for choosing SEG Solar Photovoltaic Modules (hereafter referred to “ ” • One single PV module may generate more than 30V DC when exposed to PV modules properly.
  • Page 4 Check the serial No. in the barcode with the packing list when unpacking. rechargeable batteries, etc. Provide the PV module serial No. When you need support from SEG SOLAR for a particular PV module.
  • Page 5: Mechanical Load

    UL INSTALLATION GUIDE FOR SEG UL INSTALLATION GUIDE FOR SEG PHOTOVOLTAIC MODULE PHOTOVOLTAIC MODULE Each PV module has 8 mounting holes(shown on drawing1-1).The downward mechanical load resistance of module will be different based on the location of the installation holes used(shown as table 1-1).The module frame must be •...
  • Page 6 UL INSTALLATION GUIDE FOR SEG UL INSTALLATION GUIDE FOR SEG PHOTOVOLTAIC MODULE PHOTOVOLTAIC MODULE 4.4.1 .Install module with clamps at longsides of frames For 182 & 210 modules, four mounting holes are used for the frame in the standard industry, so as to facilitate customer installation.We used four mounting holes in the frame of 182 &...
  • Page 7 UL INSTALLATION GUIDE FOR SEG UL INSTALLATION GUIDE FOR SEG PHOTOVOLTAIC MODULE PHOTOVOLTAIC MODULE WARNING Electrical Hazard This module produces electricity when exposed to light. Follow all appli- cable electrical safety precautions. Only qualified personnel can install or perform maintenance work on these PV modules.
  • Page 8 UL INSTALLATION GUIDE FOR SEG UL INSTALLATION GUIDE FOR SEG PHOTOVOLTAIC MODULE PHOTOVOLTAIC MODULE Building permits, inspections and approvals by the local utility are generally required. Clean the glass surface of the module regularly with clean water and a soft sponge or cloth.