Example Star Field Bus - ABB Symphony Harmony Series Instructions Manual

Hide thumbs Also See for Symphony Harmony Series:
Table of Contents

Advertisement

N TFB 01
N OTE : FO R FIV E TR A N S M ITTE R S :
M A X IM U M TOTA L B U S L E N G T H = 1200 M (393 7 FT)
A + B + C + D + E = 1200 M (393 7 FT)
Figure 2-8. Example Star Field Bus
Installation Complete
WBPEEUI260045A0
6
5
4
3
2
TB 4
+
+
F B 15
F B 14
F B 13
8
7
6
5
4
3
2
TB 3
+
+
+
F B 12
F B 11
F B 10
F B 9
8
7
6
5
4
3
2
TB 2
+
+
+
FB 8
FB 7
F B 6
F B 5
8
7
6
5
4
3
2
TB 1
+
+
+
FB 4
FB 3
F B 2
F B 1
Do not mix one channel inputs and two channel inputs on the
same termination unit. Whenever any termination unit is
wired for two channel input, all inputs to that particular termi-
nation unit must be wired for two channel input. If a termina-
tion unit is wired for one channel input, all inputs to that
particular termination unit must be wired for one channel
input.
The termination unit is ready for operation when:
1. The termination unit is installed on the field termination
panel.
2. The cables are connected.
3. Power wiring is connected and applied to the termination
unit.
A
1
100 M (328 F T)
+
B
100 M (328 F T)
1
+
1
50 0 M (16 40 FT)
+
D
250 M (820 FT )
1
E
+
250 M (820 FT )
Installation Complete
C
T 0 39 92 A
2 - 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Symphony harmony ntfb01

Table of Contents