Arbor Technology Garden Pergola Build Instructions

Advertisement

Quick Links

01945 410950
http://www.arborgardensolutions.co.uk
Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR
Before you commence the assembly process, we recommend that you read these instructions
thoroughly beforehand to familiarize yourself with the assembly process and to also check that
you have the correct components. If for any reason you need assistance, you can find our
contact details on the top of page of these instructions.
We highly recommend that any assembly is carried out on a flat, level surface if possible
and that you use another person to assist you if necessary.

Important:

The redwood posts are supplied at 2.7m long to give the customer the
option to concrete them into the ground and leaving finishing the structure at 2.3m
high. If you want to have pergola as a free-standing structure you must cut down posts
to 2.3m in length.

Package contents

4x Posts (x6 for 4.8m x 4.8m version)
4x 500mm diagonal braces (x8 for 4.8m x 4.8m version)
4x 800mm diagonal braces
2x Runners
6x Rafters
12 x M8 Coach screws
12 (20) x 85mm and 16 (20) x 65mm screws
1x Spacer
support@arborgardensolutions.co.uk
Garden Pergola Build Instructions

Tools required

10mm socket drive
Electric screwdriver with No2 pozidrive bit
Or No2 Pozidrive Screwdriver
Platform or Step ladder

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Garden Pergola Build and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Arbor Technology Garden Pergola Build

  • Page 1 Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Garden Pergola Build Instructions Before you commence the assembly process, we recommend that you read these instructions thoroughly beforehand to familiarize yourself with the assembly process and to also check that you have the correct components.
  • Page 2 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 1 Step 2 Put the upright perpendicular to the runner and its Take one of the posts and one of the main beams and arrange on the floor as shown outside edge make sure it is aligned with the pencil mark near the runner’s end Step 3...
  • Page 3 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 5 Step 6 4.8m x 4.8m garden pergola kit version will have Using your assistance, lay out the two finished additional upright midway. Align uprights using pencil frames, facing each other as shown above so that mark and secure with 85mm screws using pre-drilled they are approximate distance of your internal rafter...
  • Page 4 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 9 Step 10 Make sure that brace is aligned with top of the rafter Now add a longer brace to secure the rafter in place. and bottom of the brace is central and flush with the upright.
  • Page 5 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 13 Continue adding and securing the remaining 3 rafters, using the spacer as before to ensure the correct spacing. Your garden pergola kit is now completed! We hope that you found your product quick and easy to assemble but if not and you require further assistance or have any questions you can contact us via details above.

Table of Contents