Architect™ Assembly Instructions for Topper and Tech Mounts
For use with apg
Architect™ Topper
Step 1: Prior to placement onto the cash drawer, route cords
for devices to be mounted on Topper through and around half-
moon support extensions.
Step 2: If attaching a device to the center location (Figure 1),
add the mount and hardware now.
• For devices that are not mounted, cords can be routed through
an open hole or placed in a pass-through plug (Figure 2).
• If using Architect configured mounts by SpacePole
ring fits on the underside of the Topper, with the bolts coming
through the top from the peripheral base.
• Keep cords secure and flat against underside of Topper to allow
for proper fit when placing on cash drawer, included cable ties
and adhesive pads can be used for this process.
• Locations adjacent to the center mount, with 4 pilot holes, can
be drilled with a ¼" bit to allow for adjusted hardware/device
positions.
Step 3: If pairing the Topper with the customer facing Tech Mounts skip to instructions on back
now.
Step 4: Place Topper onto the cash drawer, aligning back inner two tabs to rest against the back of
drawer.
• Topper should push and snap into place.
• The open 'garage' area behind the drawer is for additional cord and power management.
Step 5: Insert solid plugs into open holes on the top and back of Topper (Figure 3 and Figure 4).
Step 6: Devices can be connected to mounts or placed on Topper in preparation for use.
Figure 1
C-000-085
C-000-085
Minota
Cash Drawer
®
®
Figure 2
support@apgsolutions.com | www.apgsolutions.com | 1 of 2
®
the flange
Figure 3
Architect™ Tech Mount instructions on back
support@apgsolutions.com | www.apgsolutins.com | 1 of 2
Hardware by SpacePole
®
/
Ergonomic
®
Solutions
Figure 4
Need help?
Do you have a question about the Architect and is the answer not in the manual?
Questions and answers