Piping layout
Regulator
Pressure gauge
for Engine
(Option)
To an accumulator
Smoke stack
or Drain tank
(Option)
Needle valve
From exhaust of
 Drain tank
(Option)
F
OIL
Burner nozzle
Oiler
Safety valve for
Safety valve for
Regulator
To servo
Overflow plug
Burner (Red)
Boiler
for Whistle
 F
Section
Open
Open
Whistle
Close
Close
To be linked
to servo
T2GR Engine
B
Gland nut
C
D
A
B2G Boiler
B2G Burner
E
5-10mm
Pre-heating tray
Fix with wood screws for convenience
so as to take in & out as unit section
Cement these surfaces to Hull
- 1 -

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the B2G and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Saito B2G

  • Page 1 INSTRUCTIONS B2G BOILER & ALCOHOL BURNER Read carefully before operation. Piping layout Regulator Pressure gauge for Engine (Option) To an accumulator Smoke stack or Drain tank (Option) Needle valve From exhaust of  Drain tank (Option) Burner nozzle Oiler Safety valve for Safety valve for Regulator To servo Overflow plug Burner (Red) Boiler for Whistle  F Section Open Open Whistle Close Close To be linked to servo T2GR Engine Gland nut B2G Boiler B2G Burner 5-10mm Pre-heating tray...
  • Page 2 Installing devices * When operating your boiler for the first time, do not connect it initially to the engine. There may be  foreign matter in the boiler which could damage the engine. First flush out the boiler for about  ten minutes and drain hot water through valve port [B] before the initial operation . (1) Place the boiler, burner, and steam engine on a flat surface. Then  fix the boiler and steam engine with wood screws. The burner  should be fixed by burner binding plates attached to the surface.   Binding plates  fixed with  (2) Connect each section by rubber tubes and metal pipes referring  wood screws to the figure. Slide to insert  under the plates Preparation for operation  ◆1. Boiler (3) Remove the overflow plug [A] and the safety valve [B]. Fill water through the port of [B] till water  comes out from the port of [A]. Placing a towel under [A] is recommended so as not to wet the  surrounding area. (4) Then fix [A] and [B] back to their original position by fingers. Do not use wrench or pliers.    ◆2.   (5) Keep both regulators closed until “Steam up” below is completed. Burner *Use only alcohol (methanol) for fuel. DO NOT use other fuels such as gasoline, paint thinner,  petroleum, etc. (6) Close the needle valve[D] using the attached handle. If not closed, alcohol will drain out.  ◆2. (7) Remove the red safety valve [C] and fill tank with fuel to 250cc (8.5 oz) using a measuring cup and  a funnel. Do not exceed 250cc or the boiler may be damaged if the flame continues to burn after  there is no water left in the boiler.  (8) Then fix [C] back to the original position by fingers.  ◆2. (9) Place the pre-heating tray under the nozzle and fill alcohol to about 50% in the tray using the  attached squirter.  Steam engine *Carefully read the instruction manual which comes with the T2GR steam engine before operation. (10) Fill the oiler with steam oil (Blue liquid). Lubricate metal, crosshead, crankshaft, eccentric, etc. as  well as all revolution and movement sections with machine oil or 50 weight automobile engine ...
  • Page 3 Ignition of the burner  ◆1. (11) Light the alcohol in the pre-heating tray. Just before the alcohol is consumed, open the needle  valve slowly to about 15 degrees for burner ignition.*If not preheated sufficiently, the alcohol will  not be vaporized. In such cases, close the needle valve and repeat the process (9) above. *The maximum opening of the needle valve is about 60 degrees  Full open Burner needle position approx. 60degs from full close. Adjust to the best position after 10 minutesʼ  operation. Full close *Usually itʼ s not necessary to open needles of both nozzles. When  0deg you want greater steam for the engine, opening both needles is  required. Steam up  *Using the pressure gauge (option) is highly recommended. (12) After the burner is ignited,  it takes about 8-12 minutes to raise pressure sufficiently. When the  pressure gauge shows 1.0~1.5kgf/cm2, open the regulator quickly to full open position and return  to full close position to get rid of remaining air inside the boiler. Then pressure drops immediately  and rises gradually again. (13) When the pressure gauge shows 1.0~2.0kgf/cm2, Steam up is completed and now you can  operate regulators to run the engine or use the whistle. CAUTION Always keep fuel can, containers, and burnable material away from the burner. And keep a wet  ◆1.  towel nearby for an emergency. Excessive tightening may greatly shorten the life of packings (O-ring, gasket, or gland packing)  ◆2.  and even strip or break the threaded  part of the needle valve, safety valves, and overflow plug. Always use fixed water and fuel levels for the boiler and burners. ◆3.  Do not fill up the boiler with hot water. ◆4.  If you restart the engine after stopping the burner forcibly by closing needle valve, there may be  ◆5.  fuel remaining in the burner.  In such cases, the burner can be re-lit immediately while the tank is  still hot. But then DO NOT add any fuel.     Or after it gets cold, drain the remaining fuel from the burner (remove the safety valve [C] and   turn the burner upside down), and follow the process outlined in (3) to (13) above to restart. ...
  • Page 4 Closing the needle valve will extinguish the flame and shut down the operation. ◇3.  Because carbon tends to collect on the nozzles, clean the nozzles after every ten operations using  ◇4.  the attached wire.     *Do not use a wire other than the attached one to clean the nozzles as any thick wire may reduce  the heating power by widening the nozzle hole. Also, clean the nozzles from the nozzle end  (boiler side). Do not loosen the screws of [E]. About heating power weaknesses, refer to the Causes and Countermeasures listed below ◇5.  The wick end should always reach the bottom of the burner to ensure steady fuel flow and flame.  ◇6.  If the wick does not touch the bottom, heating power will be reduced. In such cases, push the   wick down gently using a wire or similar object. Standard burning time is about 25 minutes. If  burning time is over 25 minutes, it means that heating power is reduced and the operator must  find and fix the cause(s).  Possible cause     Countermeasure Fuel absorbed moisture Replace remaining fuel with new alcohol. Excessive dust or  Clean using wire provided. After removing the gland nut and   carbon in nozzle      needle, pass the wire through the holes in the nozzle. Foreign matter prevents When gas leakage is caused by something preventing the valve   valve from closing  from closing completely, clean it completely All specifications and models are subject to change without notice. http://www.saito-mfg.com SAITO SEISAKUSHO CO., LTD. 22-7, 3-chome, Tokagi, Ichikawa-shi, Chiba prefecture 272-0024, Japan Phone: 047-378-4156 FAX: 047-378-4155 - 4 -...
  • Page 5 Smoking device for B2G 発煙装置 Smoking device 発煙タンク(オプション) より From smoking tank (Option) バーナーハンドルで調節 Adjust with the burner handle ・ニードルバルブをあけすぎると、生ガスの発生と、燃焼の妨げになります。あけすぎない ようご注意下さい。 約2㎜ ・オイルは、専用のスモークオイルをご使用下さい。 Approx. ・ニードルバルブはデリケートなので、過度な開閉は避けて下さい。 ・2回目からは、発煙タンク内のドレンを抜いてからオイルを入れて下さい。 ・Too much opening of the needle valve causes raw-gas and discourage combustion. So  take care not to open the nozzle too much. ・Use the dedicated oil for the smoke. ・The needle valve is very delicate so avoid opening too wide or closing too tight.  ・From the 2nd operation, pour the oil into the tank after removing waste oil from the tank. ニードルバルブ Needle valve 付属金具 ネオプレンチューブ Fitting pipe Neoprene-tube 発煙タンク Smoke tank 汽笛へ To Whistle はめる Insert バーナー ボイラー 真鍮パイプ Burner Boiler Brass-pipe 発煙タンク接続図 For B2G Fitting of the Smoke tank For B2G...
  • Page 6 - 6 -...
  • Page 7 Part List for B2G Description Q'ty Description Q'ty Boiler body Boiler mount Overflow plug Boiler band O-ring P3 Screw M3 Safety valve for boiler Nut M3 Safety valve body Superheated tube Stem Smoke emitting device O-ring P3 Smoke chamber Spring Smoke chamber fitting screw Cover Washer O-ring P8 Regulator for throttle Alcohol tank for Burner Regulator body Safety valve for burner Valve Safety valve body O-ring P2 Stem O-ring P3 O-ring P3 Lever Spring Cover Gland packing O-ring P8 Blank cap Combustion nozzle...