Installation Of Nozzle Bar; Small Baler; Loading Wagon; Chopper - Pioneer APPLI-PRO DASIC Manual

Table of Contents

Advertisement

INSTALLATION OF NOZZLE BAR – BALER
Recommendation: use 1-2 nozzles, depending on swath width.
Determine a location to mount the nozzle pipe on the front hood and above the pickup head of the
baler. Make sure not to interfere with any moving pieces of the baler. Note: Additional modification
and fabrication maybe needed for your specific machine.
The nozzle pipe can be mounted vertically or horizontally depending on your baler. Make sure the
pipe is 18" above the hay as it would be entering into the baler. This will allow for a proper spray
pattern.
Connect one end of hose to pump discharge or remote mounted gauge assembly. Connect other end
to first tee fitting on nozzle bar. Secure both ends with hose clamps.
INSTALLATION OF NOZZLE BAR – LOADING WAGONS
Recommendation: use 1-3 nozzles, depending on swath/pick up width.
Determine a location to mount the nozzle pipe over the pick up/feed intake. Make sure not to interfere
with any moving pieces of the machine. Note: Modification or fabrication maybe needed for your
specific machine.
The nozzle pipe can be mounted vertically or horizontally depending on your machine. Make sure the
pipe is ~50 cm above the crop as it would be entering into the machine. This will allow for a proper
spray pattern.
Connect one end of hose to pump discharge or remote mounted gauge assembly. Connect other end
to first tee fitting on nozzle bar. Secure both ends with hose clamps.
INSTALLATION OF NOZZLE BAR – CHOPPER
Recommendation: use 1 nozzle.
Determine a location to mount the nozzle pipe directly into the blowing or suction system.
8

Advertisement

Table of Contents
loading

Table of Contents