Download Print this page

Cello Viksberg Instruction Manual page 15

Advertisement

11
WARNING! Ensure the hose does not contact any high temperature surfaces, or it may melt and leak causing a
fire.
After the cylinder is placed inside the heater, secure the cylinder with block belt tightly.
12
W A R N I N G ! A leak test must be performed annually and each time a cylinder is hooked up or if a part of the gas
system is replaced.
WARNING! Never use an open flame to check for gas leaks. Be certain no sparks or open flames are in the area
while you check for leaks. Sparks or open flames will result in a fire or explosion, damage to property, serious bodily
injury, or death.
Leak testing: This must be done before initial use, annually,and whenever any gas Components are replaced or
serviced. Do not smoke while performing this test, and remove all sources of ignition. See Leak Testing Diagram for
areas to check. Turn all burner controls to the off position. Turn gas supply valve on.
Brush a half-and-half solution of liquid soap and water onto all joints and connections of the regulator, hose,
manifolds and valves.
Bubbles will indicate a gas leak. Either tighten the loose joint or have the part replaced with one recommended by
the Customer Care department and have the patio heater inspected by a certified gas installer.
If the leak cannot be stopped, immediately shut off the gas supply, disconnect it,and have the patio heater inspected
by a certified gas installer or dealer. Do not use the patio heater until the leak has been corrected.
1

Advertisement

loading

Related Products for Cello Viksberg

This manual is also suitable for:

502328810