When erected, the CIB635 Shed will be of the dimensions shown on page 4. The product weight is (11.15 kg unpacked) 12.2 kg (packed).
Page 3
POSITIONING AND INSTALLATION OF THE SHED POSITIONING THE SHED This shed is a temporary structure and is not recommended as a permanent building. It is designed to offer protection from sun, rain, light snow, tree sap and bird droppings etc. It is not designed to shelter equipment from excessively high winds or heavy snow.
Page 4
A supply of fresh air through the doorway will at least partly remove this issue. For long term storage of moisture sensitive belongings in all weathers, the use of a dehumidifier may be required, such as those in the CLARKE range. A suitable extension lead to a locally available power supply will be required.
COMPONENT PARTS LIST Parts & Service: 020 8988 7400 / E-mail: Parts@clarkeinternational.com or Service@clarkeinternational.com...
Page 6
ASSEMBLY WARNING: DO NOT PLACE THE PRODUCT UNDER TREES FROM WHICH HARD FRUIT SUCH AS APPLES, WALNUTS OR HEAVY PINE CONES, ETC., MAY FALL. KEEP CHILDREN AWAY DURING ASSEMBLY. DO NOT ATTEMPT TO ASSEMBLE THE PRODUCT IF ANY PARTS ARE MISSING. WARNING: DO NOT LEAVE THE SHED UNATTENDED DURING ASSEMBLY IN CASE PERSONAL INJURY OR DAMAGE MAY OCCUR.
Page 7
STEP 1: 1. Select a suitable location for the shed and assemble the base frame as shown. 2. Assembly the legs and shoulder tubes as shown. Parts & Service: 020 8988 7400 / E-mail: Parts@clarkeinternational.com or Service@clarkeinternational.com...
Page 8
3. Assemble the roof, noting that the long side of the bent tube (4) is on top of the roof. 4. Attach the door panels on the frame using the short bungees (14). Parts & Service: 020 8988 7400 / E-mail: Parts@clarkeinternational.com or Service@clarkeinternational.com...
Page 9
5. Attach the roof cover as shown in the diagram. Note the cover direction with the eyelets on both sides of the shed. 6. Tie one side of the roof cover rope ends on parts (16). Parts & Service: 020 8988 7400 / E-mail: Parts@clarkeinternational.com or Service@clarkeinternational.com...
Page 10
7. Tie the other side of the roof cover rope end on the couplers (16) (Fig A) and then through the door panel eyelet and tighten again. (Fig B) 8. Attach the main cover to the frame using the long bungees (15). Parts &...
Page 11
9. Use the anchors (13) to fix the two side beams to the ground along each side. The shed is now ready for use. USING THE SHED 1. Check periodically and tighten all hardware if needed.. WARNING: IF POSITIONING THE SHED IN A WINDY LOCATION ALWAYS ENSURE THE FRONT DOOR IS KEPT FULLY CLOSED TO PREVENT WIND LIFTING THE SHED FROM INSIDE AND THAT THE SHED IS SECURELY ANCHORED TO THE GROUND.
Need help?
Do you have a question about the CIB635 and is the answer not in the manual?