Storage Prior To Assembly; Disposal Of Packaging - AL-KO EASYAIR RO-01 Installation And Operating Manual

Compact air handling unit
Table of Contents

Advertisement

1
Base frame bracket
2
Shackle (on-site)
Step
Action
1
Before lifting the units, close the inspection doors/inspection covers.
2
Use only approved and tested transport harnesses to attach them to the intended mounting points.
3
For subsequent crane transport, you must attach the base frame brackets to the base frame. Only use the fastening
material supplied by us.
4.3

Storage prior to assembly

Store the individual functional parts dry and protected from weather in their original packaging.
Cover open pallets/unpackaged units and housing parts with tarpaulins, and protect the functional parts from dirt
(e.g. chips, stones, wire, etc.).
Constant and, above all, abrupt temperature changes must be prevented during storage. In this case, there is a dan-
ger that moisture may condense. As a result, mould can form.
To avoid bearing damage, the fan must be rotated monthly if at a standstill for more than one month.
For storage periods of more than 1 year, check the ease of movement of the fans' bearings (by turning by hand)
before assembly.
Avoid distorting the housing or other damage during storage.
Damage resulting from improper packaging and storage are at the expense of the person responsible.
4.4

Disposal of packaging

When disposing of the packaging, comply with the relevant local environmental and recycling regulations in
your country and community that are applicable at the time when the activity is undertaken.
22
2
Installation and Operating Manual (translation)
AL-KO EASYAIR
1
®

Advertisement

Table of Contents
loading

Table of Contents