Page 1
HIGH POST MODEL: HP INSTALLATION HEAD VISUAL “SAFE” INDICATOR OUTER TUBE LOCK PIN INNER TUBE STORAGE PIN HOLE FOOT STEP 1 Ensure foot is fully threaded in. When all the steps are completed, the High Post is ready for the Locate the post and ensure it is visually plumb.
Page 2
DISMANTLING STEP 1 Turn the post clockwise until the head is clear of the slab above. STEP 2 Remove the lock pin and lower the outer tube to its lowest position. STEP 3 Install the lock pin in the “Storage Pin Hole” and ensure foot is fully threaded in.