Download Print this page

Advertisement

Quick Links

INSTALLATION
1
2b
When all the steps are completed, the High Post is ready for the
Speed Fence or temporary guardrail to be installed
Maximum spacing of High Posts not to exceed 9' (2743 mm)
WEIGHT: 28 lbs / 12.7 kg
HEIGHT: 8'2"–13'6" / 2489–4115 mm
CLOSED HEIGHT: 7'1" / 2159 mm
HIGH POST
2a
3
MODEL: HP
HEAD
OUTER TUBE
LOCK PIN
INNER TUBE
FOOT
STEP 1
Ensure foot is fully threaded in.
Locate the post and ensure it is visually plumb.
Minimum edge distance: 2" (50 mm)
STEP 2
Remove the lock pin and extend the outer tube
until the head contacts the slab above.
Install the lock pin in the closest hole.
STEP 3
Turn the post counterclockwise until it is tight
and until there is no red showing at the visual
"safe" indicator.
VISUAL "SAFE"
INDICATOR
STORAGE PIN HOLE

Advertisement

loading

Summary of Contents for DC HP

  • Page 1 HIGH POST MODEL: HP INSTALLATION HEAD VISUAL “SAFE” INDICATOR OUTER TUBE LOCK PIN INNER TUBE STORAGE PIN HOLE FOOT STEP 1 Ensure foot is fully threaded in. When all the steps are completed, the High Post is ready for the Locate the post and ensure it is visually plumb.
  • Page 2 DISMANTLING STEP 1 Turn the post clockwise until the head is clear of the slab above. STEP 2 Remove the lock pin and lower the outer tube to its lowest position. STEP 3 Install the lock pin in the “Storage Pin Hole” and ensure foot is fully threaded in.