Chassis Board; Chassis Installation - Panasonic TX-42LZ80X Service Manual

Table of Contents

Advertisement

5 Chassis Board

5.1.

Chassis Installation

1. Fix 12 pcs screws to 'A-board' and 'P-board'.
Tightening torque should be 50 Ncm to 80 Ncm (5 kgf cm to 8 kgf cm).
2. Fix connectors G1, G2 and G3 at AT G-board.
3. Fix 2 pcs screws to the side of AV bracket assembly.
Tightening torque should be 100 Ncm to 130 Ncm (10 kgf cm to 13 kgf cm).
4. Fix 1 pcs screw to cabinet with power switch PCB bracket.
9
TX-42LZ80X/Y

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tx-42lz80y

Table of Contents