Manual Operation; Restoring Normal Operation; Maintenance - Genius RAINBOW 324 C Manual For The Installer

Hide thumbs Also See for RAINBOW 324 C:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 8
unit, please refer to the instructions for the control unit.
makes the wiring and programming operations for the control unit
easier.
6. START-UP
Check the status of the signalling LEDs and of the control unit.
Perform the programming procedure for the control unit according to
your needs.
Perform a functional check of all the accessories connected, paying
special attention to the safety devices.
Close the unit enclosure and position it horizontally.
Inform the end user about the correct operation of the automated
system
Show the release and lock operations of the automated system.
Hand over the booklet "User's guide": this is a detachable booklet in the
middle of the manual. Fill out the enclosed maintenance register.

7. MANUAL OPERATION

If a manual operation of the rod is necessary due to a fault of the
automated system or to a power cut, operate as follows:
Cut power to the system using the differential switch upstream
of the system.
Insert the key into the release device and turn it clockwise until it stops,
.

8. RESTORING NORMAL OPERATION

To prevent an involuntary pulse from activating the automated
system, make sure the system is not powered up using
the differential switch, before restoring normal operation
mode.
Turn the release device counter-clockwise until it stops, Fig. 29 ref.
.
Turn the key counter-
29 ref
.
Power up the system again.

9. MAINTENANCE

To ensure a correct operation and a constant safety level over time
perform, every six months, a general check of the system paying special
attention to the safety devices. The booklet "User's guide" contains a form
for the registration of the maintenance operations.
Every maintenance job or inspection performed by the operator
must only occur after having cut power to the system and
with the rod in vertical position.
For the correct operation of the barrier, we recommend you to periodically
replace the spring and the balancing springs. The table below shows the
spring life according to the type of automated system and spring used:
Spring type
RAINBOW 324 C RAINBOW 524 C RAINBOW 724 C
Strong spring
500.000 cycles
Soft spring
In applications with a double spring also replace the tie rod adjustment
Fig. 20 ref
.
To remove the spring or the balancing spring in complete safety, operate
as follows:
Cut power to the system.
Prepare the operator for manual operation; move the rod into vertical
position and lock the operator again making sure that it cannot be
moved manually.
Remove the upper cover and the panel.
Now you can remove the balancing springs.
If you need to remove the rod for maintenance operations, you need to
perform the following:
Remove the balancing springs as described before.
Prepare the operator for manual operation and move the rod into
horizontal position.
Now you can remove the rod.
The rod can only be removed after having removed the balancing
springs.
.
.
.
500.000 cycles
200.000 cycles
500.000 cycles
350.000 cycles
10. REPAIRS
The user must not attempt any repair or job and must only and exclusively
11. ACCESSORIES
11.1. ARTICULATION KIT
installation in covered places.
If the articulation kit is used, the balancing spring must be
adapted.
11.2. SKIRT KIT
in lengths of 2 meters.
If the skirt kit is installed, the balancing spring must be adapted.
11.3. END FOOT
If the end foot is used, the balancing spring must be adapted.
11.4. FORK SUPPORT
It prevents the rod, when closed, from bending and splitting due to
external stresses.
It allows the rod to rest when closed thus preventing any bending.
The use of the fork support does not imply any adaptation of the
balancing spring.
For the positioning of support refer to the dimensions shown in
11.5. PHOTOCELL SUPPORT
photocells aligned with the rod.
The second photocell must be positioned using a column.
11.6. LUMINOUS STRIP FOR UPRIGHT
The luminous strip for the upright increases visibility of the automated
Its operation is controlled by the control unit.
11.7. LUMINOUS STRIP FOR ROD
The luminous strip for rod is positioned on top of the rod to increase its
visibility. The operation of the strip is controlled by the control unit.
If the luminous strip is used on the rod, the balancing spring must
be adapted.
11.8. BATTERY KIT
A tray to house buffer batteries (not supplied) is located in the upright.
For models RAINBOW 524 C and RAINBOW 524 C you can use 24V
7Ah batteries, whereas for the RAINBOW 724 C model you can use
24V 12Ah batteries.
Page 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rainbow 524 cRainbow 724 c

Table of Contents