Example with natural gas G20:
Operation at maximum modulating output
Gas pressure at an output of 8000kW
Pressure in combustion chamber
39.2 + 5
pressure required at test point 1)(Fig. 29).
5.14.5 Pilot - gas train connection
The burner is fitted with a dedicated gas train that is fixed to the
pipe coupling.
It should be connected to the main train downstream the fil-
ter or the pressure adjuster (depending on configuration).
Supply pressure 68 ÷ 500 mbar.
WARNING
5.14.6 Ignition pilot burner
For proper operation, adjust gas pressure (measured at pressure
test point 1)(Fig. 30) as follows:
Model
Gas
RLS 1300/E C11
G20
Check pilot flame stability before starting up the
main burner.
WARNING
In the case of ignition problems check:
correct positioning of the ignition electrode;
the gas pressure, according to indications.
+
2
= 39.2 mbar
=
5 mbar
= 44.2 mbar