GE ASH06 Owner's Manual And Installation Instructions page 12

Room air conditioners owner's manual and installation instructions
Table of Contents

Advertisement

Available languages

Available languages

PREPARE AIR CONDITIONER
3
(CONT.)
Insert the frames of the accordion panels
D
into the top and bottom mounting rails.
Attach the accordion panels to the side
of the case using 6 type A screws.
Top mounting
rail
Accordion panels
INSTALL AIR CONDITIONER IN
4
WINDOW
Cut the window sash seal to the window
A
width and stick the adhesive side to the
bottom of the sash.
B
Place the air conditioner on the stool
with the bottom mounting rail against
its back edge. Center it and close the
window securely behind the top mounting
rail. It should be level or slightly tilted
to the outside. Use a level; about a 1/3
bubble will be the correct case slant to
the outside.
Installation Instructions
Window
sash seal
12
INSTALL AIR CONDITIONER IN
4
WINDOW (CONT.)
Extend the left and right accordion
C
panels to the vertical window sashes and
attach with 4 type B screws.
Type B
screws
Type B
screw
Attach the brackets to the stool on both
D
sides using two type B screws.
Tighten the screws to secure the brackets
E
in place on each side of the air conditioner.
INSTALL SECURITY BRACKET
5
AND FOAM TOP WINDOW
GASKET
A
Attach a security bracket with a type B
screw.
B
Cut the foam top window gasket to the
window width.
C
Stuff the foam between the glass and the
window to prevent air and insects from
getting into the room.
Caulk or weather-strip any gaps or
openings to the outside to seal the
installation.
The installation is now complete.
Type B
screws

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ash08Ast05Asw05Asw06Asw08

Table of Contents