Download Print this page
Hide thumbs Also See for level:

Advertisement

Quick Links

User Manual
level

Advertisement

loading
Need help?

Need help?

Do you have a question about the level and is the answer not in the manual?

Questions and answers

Summary of Contents for viveroo level

  • Page 1 User Manual level...
  • Page 2 The installer is responsible for selecting the proper mounting location and safe installation of level. This also applies to installation in movable parts, such as doors. The installer is responsible for performing and documenting all necessary safety tests.
  • Page 3: Technical Data

    Low voltage 12 Vdc Electrical Power consumption 18 Watt connections Removal from level may be removed from the power supply via the circuit breaker in the respective rooms. power supply Circuit Breaker 16A (EU) , 20A (USA/Canada) Overvoltage OVC II...
  • Page 4: Delivery Content

    Installation of level with MountingSet Inwall and Inwall zero Page 5-7 Installation of level with PoE Adapter Page 7 Installation of level with PoE Adapter, mounting without MountingSet Inwall Page 8 Removing the cover after installation Page 9 Delivery Content Illustrations are exemplary.
  • Page 5: Installation

    1. Installation of the viveroo level with the Inwall and Inwall zero - If you are using the level with a PoE adapter, please start with step 2.1 - If you want to install the level without the Inwall assembly set, please start with step 3.1 Step 1.1 Install the flush-mounted box according to the "installation guide“.
  • Page 6 ! Note: In this state, the iPad is not yet securely fixed in the holder. Keep holding it to prevent it from falling. Step 1.6 Mount the connector fuse with the two screws provided. The iPad is now secured against falling out. level, Product- and Mounting guide, Page...
  • Page 7 Installation Step 1.7 Push the cover onto the holder. Installation with PoE Adapter („level PD“) Step 2.1 Install the flush-mounted box according to the "installation instructions". Please note all the assembly steps and safety instructions listed there. Step 2.2 Place the PoE adapter in the middle of the installation box.
  • Page 8 Installation Illustrations and texts are exemplary. Depending on the iPad and USB port, other power supplies or cables can be supplied. 3. Installation of the viveroo level in furniture, installation without the Inwall installation set Step 3.1 Make the cutouts according to the "installation instructions".
  • Page 9 Step 4.3 To release the suction cups from the panel, the handles must first be folded back into the angled position. Then the suction cups can be easily removed. level, Product- and Mounting guide, Page...

This manual is also suitable for:

Rev20211014