Ground Mount
Materials Include:
4 Galvanized Steel Ground Augers
4 Plastic Mounting Sleeves
4 Bolts & Wing Nuts
4 White Stainless Screws
1 Steel Turning Rod
General Information:
1. Read instructions carefully before assembling.
2. Identify each component from material list.
3. In the event of missing or defective parts, Please call our customer
service department:
North America ph# 1-800-282-9346
United Kingdom ph# (44) 2038 687160
1
Refer to your arbor instructions
for exact dimensions between
posts. Measure out and mark on
the ground each post location.
Double check your spacing
before continuing.
Arbor Mounting System
Installation & Mounting Instructions
(Mon. -Fri. 8 am to 4 pm EST)
(Mon.-Fri. 1 pm to 10 pm GMT)
2
Turn the auger using the turning
rod and apply even downward
pressure. For dry or hard ground,
use water to soften the ground
first.
Surface Mount
Materials Include:
4 Galvanized Steel Surface Mounts
4 Plastic Mounting Sleeves
4 Bolts & Wing Nuts
4 White Stainless Screws
Additional Hardware Required:
16 1/4" (6 mm) x 2 3/4" (70 mm) Cement Screws with
Drill Bit (3/16" (4.7 mm) , Minimum 3" (76 mm) Long)
Tools Required:
1. Cordless Drill
2. Spirit Level
3. Tape Measure
3
As you turn the auger into the
ground, check with your level
to ensure it is straight. Do this
at least twice before you have
completely installed the mount.
VR 2.0 - 072617
Need help?
Do you have a question about the VA80040 and is the answer not in the manual?
Questions and answers