Coreline 150 Installation, Operation & Maintenance Manual

Coreline 150 Installation, Operation & Maintenance Manual

Advertisement

Quick Links

Installation-Operation-Maintenance Manual
2pc Flanged Ball Valve
Fig.150
English
SIL
ATEX, CE, SIL and EU1935/2004 (European food approval) for Coreline ball valves.
EU1935/2004
www.coreline.dk

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 150 and is the answer not in the manual?

Questions and answers

Summary of Contents for Coreline 150

  • Page 1 Installation-Operation-Maintenance Manual 2pc Flanged Ball Valve Fig.150 English ATEX, CE, SIL and EU1935/2004 (European food approval) for Coreline ball valves. EU1935/2004 www.coreline.dk...
  • Page 2 □ The stem must be removed from inside of the body. Slightly push the stem head to loose the stem. The stem washer and the O-ring should come out together with the stem. □ Remove the stem packing from the body. www.coreline.dk...
  • Page 3 □ Check stem seal by covering the stem top area with water/soap solution. Tighten stem seal if leakage occurs until leakage just stops. □ Apply a water pressure test according to API598 if Valve torque test Coreline Fig.150 ball valves are applied with below torques (See Table 1) when the valves are delivered. Body bolt Stem nut Size...
  • Page 4 Add: No.210 Xinyuan Road, Ehu Industrial Park, 214116 Wuxi, China The contents of this catalogue are confidential Phone: +86 510 8852 5336 and proprietary to Coreline, we reserve the right to change the specifications without any notice. Http: // www.coreline.dk E-mail : mail@coreline.cn...

Table of Contents