Cub Cadet CSV 050 Operator's Manual page 8

Yard vacuum/chipper/shredder with vacuum/hose
Hide thumbs Also See for CSV 050:
Table of Contents

Advertisement

Available languages

Available languages

4.
Pull the two cable ties attached to the cables tight
approximately 8 inches from each cable end and place the
cables into the cable guide.
5.
Loosen the wing nut that secures the rope guide to the
right side of upper handle.
a.
Slowly pull starter rope out of engine.
b.
Slip the starter rope into the rope guide. Tighten the
wing nut. See Fig. 3-3.
Hose Assembly
1.
Slide hose adapter of hose assembly into the base adapter
located on the left front of the Chipper shredder Vacuum.
See Fig. 3-4A.
A
Align Pin with
this Hole
8
s
3 — a
ectiOn
sseMbly
B
A
Figure 3-3
B
Figure 3-4
& s
-u
et
p
2.
Pull spring loaded pin out on the base and align pin with
the first hole (closest to the end of the tube) in the hose
adapter. See Fig. 3-4B.
3.
Release the pin to lock the hose in place.
4.
Snap the hose handle first into the upper hose handle
bracket and then into the lower hose handle bracket. See
Fig. 3-5A.
A
B
Figure 3-5
5.
Lay hose tubing in curved end of hose handle next to
chipper chute and into hose cradle. See Fig. 3-5B & C.
C

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents