Download Print this page

Advertisement

Quick Links

Operators manual
UL50
(Including SN variant)

Advertisement

loading
Need help?

Need help?

Do you have a question about the UL50 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mace UL50

  • Page 1 Operators manual UL50 (Including SN variant)
  • Page 2 SAFETY RULES UL500 Danger Failure to obey the instructions and safety rules in this manual will result in death or serious injury. Do Not Operate Unless: You learn and practice the principles of safe machine operation contained in this operator's manual. 1 Avoid hazardous situations.
  • Page 3: Table Of Contents

    Only trained and authorized personnel shall be permitted to operate this machine. This manual should be considered a permanent part of your machine and should remain with the machine at all times. If you have any questions, please call Mace Industries. Contents Safety………………………………………….……..4 Pre-operation inspection……………….…..6...
  • Page 4: Safety

    Safety instructions Hazards Fall Hazards Do not use when under the influence of Always erect a safety barrier to prevent alcohol or drugs. access through underside of machine. Failure to do so could result in serious injury. Do not use the machine as a ground for welding.
  • Page 5 Be sure all maintenance has been performed as specified in this manual and the appropriate Mace Industries service manual. Explosion and Fire Hazards Be sure all decals are in place and legible. Do not operate the machine in hazardous...
  • Page 6: Pre-Operation Inspection

    Pre-operation Inspection Fundamentals It is the responsibility of the operator to perform a pre-operation inspection and routine maintenance. The pre-operation inspection is a visual inspection Do not operate unless: performed by the operator prior to each work shift. You learn and practice the principles of safe The inspection is designed to discover if anything machine operation contained in this is apparently wrong with a machine before the...
  • Page 7 Pre-operation Inspection Be sure the main belt is properly tensioned and in good condition. Be sure the belt carriers are secure and in good condition. Check the following components or areas for damage, modifications and improperly installed or missing parts: o Electrical components o Limit switch (If any) o Controls (fwd/rev/stop)
  • Page 8: Maintenance

    Maintenance Check main belt tension: Maintaining the proper belt tension is essential to good machine performance and service life. Operating the machine with an improper belt tension can damage machine components. Check belt tension whilst power is off. Observe and Obey: 1.
  • Page 9: Function Tests

    Function tests Fundamentals The function tests are designed to discover any malfunctions before the machine is put into service. The operator must follow the step-by- step instructions to test all machine functions. A malfunctioning machine must never be Do not operate unless: used.
  • Page 10 Function tests: 1. Ensure the conveyor is turned on at power source. 2. Ensure all Emergency stops are out. (Press reset on control panel if needed) 3. At ground controls; press FWD (3) – Belt will move forward. 4. Press STOP (2) – Belt will stop. 5.
  • Page 11: Workplace Inspection

    Workplace inspection Fundamentals The workplace inspection helps the operator determine if the workplace is suitable for safe machine operation. It should be performed by the operator prior to using the machine in the workplace. It is the operator's responsibility to read Do not operate unless: and remember the workplace hazards, then watch for and avoid them whilst...
  • Page 12: Operating Instructions

    Operating instructions Fundamentals The Operating Instructions section provides instructions for each aspect of Do not operate unless: machine operation. It is the operator's responsibility to follow all the safety rules and instructions in the operator's, safety You learn and practice the principles of safe and responsibilities manuals.
  • Page 13 Operating instructions: 1. Press desired direction of belt. FWD/ REV. 2. Plan the movement you will make to place item onto conveyor belt. Remember to place the item in the centre of belt to minimise the risk of falling. 3. Place item onto conveyor belt. Ensure correct manual handling technique is followed.
  • Page 14: Specifications

    Specifications Model UL-500 Machine weight Minimum 65kg Maximum payload overall 100kg Maximum single point payload 50kg Belt speed Adjustable Maximum angle 50° Electric motor 0.75kw Noise emissions (A weighted) >75dB Units 1-3 Macadam Road Earlstrees Industrial Estate Corby Northamptonshire NN17 4JN 01536 206600 Page | 14...