Kohler Freshman K-4989 Installation Manual page 4

Urinal
Hide thumbs Also See for Freshman K-4989:
Table of Contents

Advertisement

Available languages

Available languages

12-1/2"
3/4"
(31.8 cm)
Spud
19-1/4"
(48.9 cm)
2" NPS
Tap
6-3/4"
17-1/4"
(17.1 cm)
(43.8 cm)
Roughing-In Dimensions (Rear Spud)
• Roughing-In remains the same when using the optional 3" outlet
spud.
1. Preparation
Turn the water supply off.
Install or relocate the supply tubing and waste pipe as necessary
to conform to the roughing-in dimensions.
Install the shut-off valve.
Install adequate support framing for the wall hangers as needed.
1020646-2-C
16-1/4"
(41.3 cm)
10" (25.4 cm)
14-1/4"
(36.2 cm)
24"
(61 cm)
24"
(61 cm)
1/4" (6 mm)
4
35-1/2"
(90.2 cm)
To Floor
2" NPS Tap
6" (15.2 cm)
Outlet Detail
Kohler Co.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Freshman k-4989-rFreshman k-4989-t

Table of Contents