Summary of Contents for HAGOR ScreenOut Pro 75 Back-to-Back
Page 1
Pro 75“ Back-to-Back | Art.-Nr.: 2507 ® Installationsanleitung Installation manual Guide d‘installation Installatievoorschrift Guía de instalación Installationsanvisning Yükleme Rehberi инструкция по установке 安装指南 HAGOR Products GmbH | Oberbecksener Straße 97 | D-32547 Bad Oeynhausen | Telefon: +49(0)57 31-7 55 07-0 | Mail: hagor@hagor.de...
Page 2
If you are unsure about the installation of the product or have any questions, please contact us or other trained specialists. HAGOR Products GmbH | Oberbecksener Straße 97 | D-32547 Bad Oeynhausen | Telefon: +49(0)57 31-7 55 07-0 | Mail: hagor@hagor.de...
Bitte beachten! Mindestens 2 Personen zur Montage erforderlich! HAGOR Products GmbH | Oberbecksener Straße 97 | D-32547 Bad Oeynhausen | Telefon: +49(0)57 31-7 55 07-0 | Mail: hagor@hagor.de...
Page 4
(C). The stele stands firmly on the pallet because it is still attached with transport locking screws. HAGOR Products GmbH | Oberbecksener Straße 97 | D-32547 Bad Oeynhausen | Telefon: +49(0)57 31-7 55 07-0 | Mail: hagor@hagor.de...
Page 5
Loosen and remove the 6 screws of the front panels on both sides (C) and now take the both front panels (D). HAGOR Products GmbH | Oberbecksener Straße 97 | D-32547 Bad Oeynhausen | Telefon: +49(0)57 31-7 55 07-0 | Mail: hagor@hagor.de...
Page 6
Loosen and remove the 4 transport locking screws and take the base frame of the stele out of the packaging. HAGOR Products GmbH | Oberbecksener Straße 97 | D-32547 Bad Oeynhausen | Telefon: +49(0)57 31-7 55 07-0 | Mail: hagor@hagor.de...
Page 7
Screw the stele to your foundation (red marking) (E). In addition, screw the stele to the base with the M8 screws provided (blue marking) (E). HAGOR Products GmbH | Oberbecksener Straße 97 | D-32547 Bad Oeynhausen | Telefon: +49(0)57 31-7 55 07-0 | Mail: hagor@hagor.de...
Page 8
Now mount the displays on the brackets. Appropriate mounting material and operating instructions for the monitor brackets are included. In addition, screw the stele to the base with the M8 screws provided (blue marking) (E). HAGOR Products GmbH | Oberbecksener Straße 97 | D-32547 Bad Oeynhausen | Telefon: +49(0)57 31-7 55 07-0 | Mail: hagor@hagor.de...
Page 9
Insert the front panels (A) and fix them (B). Put the base plate, cover plate and side panels back in place (C) and screw them together (D). Finally, the side panels must be secured from below with 2 screws each (E). HAGOR Products GmbH | Oberbecksener Straße 97 | D-32547 Bad Oeynhausen | Telefon: +49(0)57 31-7 55 07-0 | Mail: hagor@hagor.de...
Need help?
Do you have a question about the ScreenOut Pro 75 Back-to-Back and is the answer not in the manual?
Questions and answers