ZIV 5EVM Instruction Manual

ZIV 5EVM Instruction Manual

Electric vehicle home ac charging station

Advertisement

Quick Links

5EVM
Electric Vehicle Home
AC Charging Station
Instructions Manual for 5EVM Recharging Points
M5EVM2011Iv00
Rev. 00, May 2021 © ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 5EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for ZIV 5EVM

  • Page 1 5EVM Electric Vehicle Home AC Charging Station Instructions Manual for 5EVM Recharging Points M5EVM2011Iv00 Rev. 00, May 2021 © ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020...
  • Page 2: Table Of Contents

    Reconnector ......................12 Domestic Load Balancing (optional on PREMIUM Model) ........13 HMI and Screen Tree .................... 14 HMI Characteristics ....................14 HMI Screens ......................15 M5EVMD2011I 5EVM-D: Electric Vehicle Home AC Charging Station © ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020...
  • Page 3: Introduction

    The higher the output power, the faster the vehicle will charge. This function allows the user to make an efficient consumption without reducing comfort and without the need to modify the power term of its installation. There are additional options, such as Modbus, that can be enabled by certificates. Contact ZIV for more details. M5EVMD2011I 5EVM-D: Electric Vehicle Home AC Charging Station ©...
  • Page 4: Technical Data

    IP 54 / IK 08 Installation Mode Wall-mounted 3 fixing points Display 22 x 70 mm 4 push-bottoms. 2 Status LEDs. 1 Energy Pulses LED. M5EVMD2011I 5EVM-D: Electric Vehicle Home AC Charging Station © ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020...
  • Page 5 5EVM-D · Electric Vehicle Home AC Charging Station 332 x 229 x 86 mm Dimensions (see drawings at the end of this document). Weight < 2.5 kg Connectors Types 2 x RJ-11(RS-485) 1 x 2-pin male connector (Home AC). 1 x USB-C (no function at the moment).
  • Page 6: Standards And Tests

    IEC 60068-2-30 (Test Db) Environmental testing - Part 2-30: Tests - Test Db: Damp Heat cyclic (12 h + 12 cycle). IEC 60068-2-1 (Test Ad) Environmental testing - Part 2-1: Tests - Test A: Cold. M5EVMD2011I 5EVM-D: Electric Vehicle Home AC Charging Station © ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020...
  • Page 7: Physical Architecture And Mounting

    5EVM-D · Electric Vehicle Home AC Charging Station Physical Architecture and Mounting Description The mechanics of the device are based on the following parts: Base. Part that is attached to the wall. Front. Hides the active parts of the equipment and is attached to the base.
  • Page 8: Mounting

    For wall mounting, the equipment has three fixing points, which are marked in blue in the following image. Figure 2. Rear Base of the 5EVM. M5EVMD2011I 5EVM-D: Electric Vehicle Home AC Charging Station © ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020...
  • Page 9 5EVM-D · Electric Vehicle Home AC Charging Station For correct wall mounting, the following actions must be followed: 1. Upper fixing point: insert the plastic plug into the wall and then insert its screw so that its head has a clearance of approximately 4 mm from the wall.
  • Page 10: Connection Elements

    3. Pilot wire (CP). 4. Communication RS-485. 5. USB connector (no functionality assigned). 6. Connector for "Home AC" accessory (load balancing). Figure 5. Connection Elements. M5EVMD2011I 5EVM-D: Electric Vehicle Home AC Charging Station © ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020...
  • Page 11: Equipment Power Supply

    5EVM-D · Electric Vehicle Home AC Charging Station 4.3.1 Equipment Power Supply The power supply is represented in Figure 5 by the connector 1. The power supply is provided by screw terminals, which offer great mechanical robustness. These terminals allow cable sections of up to 25mm The equipment has the following terminals from left to right: Phase R.
  • Page 12: Domestic Charge Measurement

    5. Do not use this equipment in charging modes not covered by IEC 61851 standard. 6. ZIV is not responsible for any damage to persons, facilities or third parties resulting from failure to comply with points 1,2 and 3. The equipment does not require any maintenance operation except for the periodic checks stipulated by the regulations in force.
  • Page 13: Operation

    5EVM-D · Electric Vehicle Home AC Charging Station Operation The recharging points, depending on the model, have some or all of the functionalities described below. EV Charging This is the basic functionality. All of the family's recharging points offer vehicle recharging in mode 3 (according to IEC61851-1).
  • Page 14: Bluetooth

    ICP. M5EVMD2011I 5EVM-D: Electric Vehicle Home AC Charging Station © ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020...
  • Page 15: Domestic Load Balancing (Optional On Premium Model)

    Domestic Load Balancing (optional on PREMIUM Model) This functionality is optional for the user. Remember to ask ZIV for the 5EVM model that includes it and the necessary accessory for its operation. In installations carried out according to Scheme 2 (according to ITC-BT-52), there is a potential problem that the meter will cause the internal CB to open as a result of overconsumption.
  • Page 16: Hmi And Screen Tree

    If the VE is disconnected (Pilot Control in 'A' status), the device will go to Stopping Session regardless of the screen being displayed at that time. M5EVMD2011I 5EVM-D: Electric Vehicle Home AC Charging Station © ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020...
  • Page 17: Hmi Screens

    5EVM-D · Electric Vehicle Home AC Charging Station HMI Screens Start You will return to this screen from any other due to inactivity (30 sec). 2019/10/20 10:33 By default, the date and time will be displayed, and "Wallbox Wallbox 4.0 4.0".
  • Page 18 None. EV Action Open charging session: o Changes to ‘A’ state Session. Stopping o Changes to other states  None. Without charging session  None. M5EVMD2011I 5EVM-D: Electric Vehicle Home AC Charging Station © ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020...
  • Page 19 5EVM-D · Electric Vehicle Home AC Charging Station Main menu without recharging CHARGE NOW To see all the options, you must use the scroll buttons. The PROGRAM CHARGE setting option is shown for all users, the available options differ CONFIGURATION depending on the user.
  • Page 20 ESC  Goes to Start screen. RFID Action None. EV Action Changes to 'B' or 'C' state: Programmed charge: Waiting for charging start. Immediate charge: Charging in progress. M5EVMD2011I 5EVM-D: Electric Vehicle Home AC Charging Station © ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020...
  • Page 21 5EVM-D · Electric Vehicle Home AC Charging Station Charging in progress Energy 12.43 kWh Data from the charging in progress is displayed with a refresh Power 00.00 kW time of 1 second. Time 05h 36m LEDs Color Blue  when the vehicle demands charge (‘C’ state).
  • Page 22 Charge mode: Preferred charge mode. Contracted power (only for equipment with Load Balancing function): Contracted power Language: Language selection. RFID Action None. EV Action None. M5EVMD2011I 5EVM-D: Electric Vehicle Home AC Charging Station © ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020...
  • Page 23 5EVM-D · Electric Vehicle Home AC Charging Station Configure date/time Date 2019/05/01 On this screen you can change the date, time and time Time 15:45 zone fields. Zone LEDs Color White. Button Action ESC  The previous editable position is selected. If the cursor is on the first position, it exits to Configuration.
  • Page 24 Cancel: returns to Users/cards management without taking any action. ↓↑  Cursor selection. RFID Action Initial card pass to delete it as valid. None. EV Action M5EVMD2011I 5EVM-D: Electric Vehicle Home AC Charging Station © ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020...
  • Page 25 5EVM-D · Electric Vehicle Home AC Charging Station Preferred charge mode Immediate Allows you to change the preferred charging mode for Deferred those models with “free charge” function active. LEDs Color White. Button Action ESC  Goes to screen. Configuration OK ...
  • Page 26 None. EV Action Open charging session: o Changes to ‘A’ state Session. Stopping o Changes to other states  None. Without charging session  None. M5EVMD2011I 5EVM-D: Electric Vehicle Home AC Charging Station © ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020...
  • Page 27 5EVM-D · Electric Vehicle Home AC Charging Station Recharges historical log 2019/05/20 10:01:00 2019/05/18 12:33:34 2019/05/18 08:15:09 On this screen, the information of the last recharges (up to a maximum of 10) is shown by means of a cyclic menu.
  • Page 28 ESC  Goes to Start screen. RFID Action Linking is performed: Failed linking  Goes to Error associating. Successful linking  Goes to Card associated. EV Action None. M5EVMD2011I 5EVM-D: Electric Vehicle Home AC Charging Station © ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020...
  • Page 29 5EVM-D · Electric Vehicle Home AC Charging Station Bluetooth: Error associating A message is displayed indicating that the linkage has ERROR ASSOCIATING failed. LEDs Color White. Button Action ESC  Goes to Start screen. RFID Action None. EV Action None.
  • Page 30 Annex. Dimensions and Marking...

Table of Contents