Larkin M5500 User Manual

Power semiconductor tester

Advertisement

Larkin Power Components, Inc.
P.O. Box 14667, Spokane, WA 99214-0667, U.S.A.
Phone: 800-317-5526 Fax: (509) 891-5627
E-mail : lpc@larkinpower.com Web page : www.larkinpower.com
Power Semiconductor Tester
M5500
User's Guide
- -

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the M5500 and is the answer not in the manual?

Questions and answers

Summary of Contents for Larkin M5500

  • Page 1 Larkin Power Components, Inc. P.O. Box 14667, Spokane, WA 99214-0667, U.S.A. Phone: 800-317-5526 Fax: (509) 891-5627 E-mail : lpc@larkinpower.com Web page : www.larkinpower.com Power Semiconductor Tester M5500 User’s Guide...
  • Page 2: Table Of Contents

    Table of Content SPECIFICATIONS TESTING POWER SEMICONDUCTORS CLAMPING DEVICE FOR PRESSURE PACK DEVICES CONNECTIONS ON DIODES AND THYRISTORS OVERVIEW OF TESTING PROCEDURES TESTING SET-UP AND PROCEDURES Pressure Pack SCRs (Thyristors) Pressure Pack Diodes Stud-mounted diodes GTOs (Gate Turn-off Thyristor) Power Modules Transistor Modules (IGBTs and DARLINGTONs) Diode Modules for Rotating Rectifiers USING THE OSCILLOSCOPE OPTION...
  • Page 3: Specifications

    SPECIFICATIONS Electrical specifications apply for an operating temperature range of 15 F to 120 (-10 C to 50 C), relative humidity up to 80%. Input Voltage of M3K-120V Test Set 100-125V, 50-60Hz, 2A Input Voltage of M3K-240V Test Set 220-245V, 50-60Hz, 2A High Voltage Mode (PRV/PFV) Peak Reverse and Forward Voltage 0 - 5800 V...
  • Page 4: Testing Power Semiconductors

    CAUTION * * * * * * * The part to be tested must be Isolated & De-energized! Connecting the tester to live equipment will damage the tester. This equipment operates at voltages as high as 6400V. Under no circumstances should the equipment EVER be operated without using the 3 wire line cord, plugged into a properly grounded outlet.
  • Page 5: Clamping Device For Pressure Pack Devices

    SIMPLE CLAMPING DEVICE TESTING OF PRESSURE PACK DEVICES The simple clamp arrangement below is sufficient for testing pressure pack devices, since the force required to test these devices only has to be approx. 200 lbs. Cathode Anode Gate CONNECTIONS ON DIODES AND THYRISTORS Diodes Anode Cathode...
  • Page 6: Overview Of Testing Procedures

    OPERATING INSTRUCTIONS *** CAUTION : UP TO 6400V ON TEST LEADS *** INTRODUCTION This Power Semiconductor Tester is designed to perform testing of power semiconductors, such as, SCRs/Thyristors, Diodes, IGBTs, Transistors, and most MOS FETs. The Cathode (Emitter) of the device under test is operated near ground potential. The tester performs three tests : PFV (Peak Forward Voltage), PRV (Peak Reverse Voltage), and Gate Voltage and Current to trigger (Base Current for Transistors).
  • Page 7 SCRs (THYRISTORS) Make sure the Voltage Control is at the zero position (fully counter clock-wise) before turning the unit on. Connect the Anode, Gate and Cathode leads to the device to be tested. DO NOT MIX UP THE ANODE AND CATHODE LEADS OR HIGH VOLTAGE WILL BE APPLIED TO THE GATE! Place the function switch in the PRV position and press the “TEST”...
  • Page 8: Testing Set-Up And Procedures

    TESTING SET-UP AND PROCEDURES PRESSURE PACK (Hockey Puck) SCRs (Thyristors) Make sure the Voltage Control is at the zero position (fully counter clockwise) before turning the unit on. Connect the Anode, Gate and Cathode leads to the device to be tested. DO NOT MIX UP THE ANODE AND CATHODE LEADS OR HIGH VOLTAGE WILL BE APPLIED TO THE GATE! Place the function switch in the PRV position and press the “TEST”...
  • Page 9: Pressure Pack Diodes

    PRESSURE PACK (Hockey Puck) Diodes Make sure the Voltage Control is at the zero position (fully counter clockwise) before turning the unit on. Connect the Anode and Cathode leads to the device to be tested. NOTE : Diodes only have to be tested in one direction. If the diode is forward biased (standard), the function switch should be in the PRV position.
  • Page 10: Gtos (Gate Turn-Off Thyristor)

    GTOs (Gate Turn Off Thyristors) Make sure the Voltage Control is at the zero position (fully counter clock- wise) before turning the unit on. Connect the Anode, Gate and Cathode leads to the device to be tested. DO NOT MIX UP THE ANODE AND CATHODE LEADS OR HIGH VOLTAGE WILL BE APPLIED TO THE GATE! Place the function switch in the PRV position and press the “TEST”...
  • Page 11: Power Modules

    POWER MODULES Power Modules comes in a variety of configurations and sizes. The testing procedures described below illus- trates the the set-up for a Dual Thyristor Bridge. The principle is the same for Thyristor/Diode, Diode/Diode, and single Diode or Thyristor Modules. Make sure the Voltage Control is at the zero position (fully counter clockwise) before turning the unit on.
  • Page 12: Transistor Modules (Igbts And Darlingtons)

    Transistor Modules (IGBTs and Darlingtons) • Connect test lead between the Ground Plate of the component and the GROUND terminal on the tester. • Connect a 100k ohm Resistor between the BASE and EMITTER terminals on the tester. • Do Not Mix Up the COLLECTOR and EMITTER Leads or HIGH VOLTAGE will be Applied to the BASE!
  • Page 13: Diode Modules For Rotating Rectifiers

    Diode Modules for Rotating Rectifiers Make sure the Voltage Control is at the zero position (fully counter clockwise) before turning the unit on. Connect the Anode and Cathode leads to the diode to be tested. NOTE : Diodes only have to be tested in one direction. If the diode is forward biased (standard), the function switch should be in the PRV position.
  • Page 14: Using The Oscilloscope Option

    Note: The oscilloscope option can be used while testing any type of power semiconductor mentioned in this manual Larkin Power Components, Inc. P.O. Box 14667, Spokane, WA 99214-0667, U.S.A. Phone: 800-317-5526 Fax: (509) 891-5627 E-mail : lpc@larkinpower.com Web page : www.larkinpower.com...

Table of Contents