Page 1
CHASE TECHNICAL INFORMATION & INSTALLATION MANUAL Direct Fix & Cavity System Chase Building Supplies Pty Ltd Version 2.4 – November 2020 COMPLETE EXTERNAL WALL CLADDING BAL 29 SYSTEM WHICH ADHERES TO: NCC 2019, Vol 2, BCA Class 1 and Class 10 Buildings Relevant Australian Standards AS 1530.8.1:2018...
Page 2
CHASE - Render Guide CHASE EPS RENDER High bond strength, medium grade cementitious render for application to low porosity surfaces. Key Features • High polymer modification • Excellent durability, workability for excellent bond strength and application properties • Factory blended for optimum •...
The National Construction Code 2019 (NCC) – Building Code of Australia, Volume 2 for Class 1 & 10 buildings is a performance based code. Chase EPS has been extensively tested & is certified to meet the performance requirements prescribed by the code: •...
Page 7
System Summary Chase EPS External Wall Cladding System consists of M Grade expanded polystyrene directly screwed or installed via a cavity system, to either steel or timber wall framing through breathable wall wrap. The system is very versatile due to the capability of both direct fix or a cavity system and is designed to be used in residential construction.
Europe. EIFS is a lightweight system that has design flexibility that provides peace of mind. Chase EPS External Wall Cladding System is versatile, light weight and energy efficient and has been designed for Australian conditions.
3.1 Structural Performance - Direct Fix & Cavity System Chase EPS External Wall Cladding System with 75mm minimum thickness panels has been designed and tested to withstand the strength limit state design wind loads for AS 4055 Wind Classifications N1, N2, N3 and N4.
3.2 Dampness and Weatherproofing Performance Chase EPS External Wall Cladding System complies with the NCC 2019 performance requirements for weatherproofing and dampness. This has been confirmed by testing in accordance with the verification method V2.2.1 in the NCC 2019. This verification method requires that a test specimen is constructed and tested so that the weatherproofing performance of many of the common combinations of details found in normal construction practice can be examined.
P3.10.5. Chase EPS External Wall Cladding must not be exposed to temperatures more than 80˚C for long periods due to the risk of softening and damage. Heat producing appliances e.g. BBQ’s & Patio Heaters, Hot Water Services, Flues from Heating Appliances, all must be installed in accordance with manufacturers’...
Page 15
Chase components be used in the application process of the system. The substitution of any Chase EPS cladding or Chase system fixings (screws & washers) is not permitted on any Chase EPS External Wall Cladding System application. All other components may be substituted with equivalent alternatives that meet the specifications of the products used in this manual and the required building standards.
4.4 For Cavity System - Battens Battens may be EPS, timber or steel with a depth of between 15-40mm 4.5 Chase EPS Panel Chase M Grade fire retarded expanded polystyrene manufactured in accordance with AS 1366.3, in the selected thickness and size.
4.6 Chase System Fixings (screws & washers) Screws- Chase 10G Bugle head, coarse thread Class 3 screws (Class 4 in corrosive environments) to suit timber or steel framing. Screws must comply with the corrosion protection requirements of AS 4773 (Part 4 and Appendix C).
Chase Texture Coverage: Approx. 10-12m2 , per pail. 4.12 Sealant (By Builder) Sealant (by builder) around windows, penetrations, control joints and where Chase EPS & any other substrate meet. When looking to achieve BAL 29 a fire rated (up to 4 hours fire protection in accordance with AS 1530.4) intumescent, low modulus, one component and Class A polyurethane sealant such as Bostik...
The following products are optional and are used on an “as needed” basis dependant on specification of the project. - Chase primer (tintable) – The primer assists in adhesion of the texture coat and would be used after application of render but before application of texture. We strongly recommend the use of a tinted primer where a dark colour texture is to be applied.
5.1 Installation to Achieve Bushfire Attack Level (BAL 29) In order to achieve BAL 29, The complete Chase EPS External Wall Cladding System must be used. The System must be installed in accordance with this manual and be comprised of a precise group of specified materials to meet the Bushfire Attack Level standard as tested (AS1530.8.1-2018).
Installation Product selection, and incorporation of the Chase EPS External Wall Cladding System into the building design, should be made by a person who is familiar with the application and technical aspects of the product, with ready access to the relevant technical information related to product use.
CONNECTED TO THE STUD 50mm FROM THE EDGE OF THE PANEL BACKBLOCKING MUST BE OF SIMILAR SPECIFICATION TO THE STUD & RIGIDLY CONNECTED TO THE STUD System Name CHASE EPS PANEL Notes Revisions EXTERNAL WALL CLADDING SYSTEM DIMENSIONS ARE SHOWN Drawing Name...
TO ACHIEVE A CAVITY SYSTEM BATTENS ARE TO BE INSTALLED VERTICALLY NOTE: FIXINGS MUST BE AT MIN. 25mm & AT MAX. AT EVERY STUD 50mm FROM THE EDGE OF THE PANEL NOTE: NO BATTENS ARE TO BE HORIZONTAL BACKBLOCKING MUST BE OF SIMILAR System Name Notes Revisions CHASE EPS PANEL...
If the frame is not level, appropriate measures such as packing out the frame should be completed prior to installing the panel. Chase Breathable Builders Paper – To be fixed over c. Pressure is applied to the surface to ensure the studs, cut openings around penetrations firm contact with the substrate;...
Page 27
12. Mixing Chase Render recomend using a U shaped starter channel where possible. a. Prior to the application of Chase EPS render ensure that the substrate is clean and free 5. Cutting Panels - The use of Personal Protective of any impurities that may compromise Equipment is required for cutting Chase EPS.
Page 28
Bostik Fireban One should be used to a depth of 20mm (+/- 5mm). When cured it 14. Applying Chase Texture – (also see Section 4.12) will form a tough, flexible fire rated seal capable of cyclic expansion and compression.
Construction Details Chase EPS External Wall Cladding System must be installed in accordance with this Technical Information and Installation Manual and be in accordance with all relevant building codes, Australian Standards and Regulations. Typical construction details are provided as a guide for construction industry professionals.
TYPICAL CONCRETE SLAB REBATE DETAIL - DIRECT FIX ADDITIONAL WALL INSULATION BREATHABLE AS SPECIFIED WALL WRAP WALL LINING CHASE EPS PANEL RENDER/MESH/TEXTURE NOTE: SCREWS MUST BE DRIVEN A MINIMUM OF 25 MM DEPTH INTO STUD. THEREFORE SHOULD BE A MINIMUM OF 25 MM LONGER THAN SKIRTING...
SKIRTING FIXING WASHER & SCREW NOTE: SCREWS TO BE MIN 25 MM DEPTH INTO STUD FLOOR COVERING BREATHABLE WALL WRAP CHASE EPS PANEL RENDER/MESH/TEXTURE EXTERNAL CORNER BEAD 15 MM +/- 5 MM CLEARANCE OPTIONAL SEALANT (BY BUILDER) CEILING LINING METAL FLASHING BY OTHERS...
ROOF AS SPECIFIED FIXING WASHER AND SCREW NOTE: SCREWS TO BE MIN 25 MM DEPTH INTO STUD SUPPORT FRAMING RENDER/MESH/TEXTURE CHASE EPS PANEL BREATHABLE WALL WRAP ADDITIONAL WALL INSULATION AS SPECIFIED METAL BOX GUTTER WITH BOX GUTTER AS SPECIFIED TYPICAL METAL CAPPING PARAPET WALL TO ROOF DETAIL - CAVITY SYSTEM...
NOTE: SCREWS TO BE MIN 25 MM DEPTH INTO STUD BREATHABLE WALL WRAP CEILING LINING RENDER/MESH/TEXTURE WALL LINING CHASE EPS PANEL ADDITIONAL WALL INSULATION AS SPECIFIED TYPICAL HORIZONTAL EXPANSION JOINT DETAIL EXTERNAL CORNER BEADS ON EACH EDGE - CAVITY SYSTEM System Name...
EXTERNAL CORNER BEADS ON EACH EDGE - CAVITY SYSTEM WALL INSULATION AS SPECIFIED FRAMING AT 600 MM MAX. CENTERS BATTEN FOR CAVITY SYSTEM System Name CHASE EPS PANEL Notes Revisions EXTERNAL WALL CLADDING SYSTEM APPROVED EXTERNAL CORNER BEAD Drawing Name TYPICAL VERTICAL...
7.12 Window Head TYPICAL WINDOW HEAD DETAIL - DIRECT FIX SPECIFIED WINDOW SYSTEM FLASHING TAPE REVEAL AS SPECIFIED ADDITIONAL WALL INSULATION CHASE EPS PANEL AS SPECIFIED SEALANT (BY BUILDER) ALL WRAP ARCHITRAVE AS SPECIFIED FRAMING AS SPECIFIED EXTERNAL CORNER BEAD...
7.17 Service Penetration 7.17 Service Penetration TYPICAL SERVICE PENETRATION DETAIL - DIRECT FIX ADDITIONAL WALL INSULATION CHASE EPS PANEL AS SPECIFIED 10 MM GAP AROUND PENETRATION BREATHABLE WALL WRAP FIXING WASHER AND SCREW NOTE: SCREWS TO BE MIN 25 MM DEPTH INTO STUD...
EXTERNAL FIXTURES WALL INSULATION AS SPECIFIED BREATHABLE WALL WRAP LACED ER WALL WRAP RENDER/MESH/TEXTURE CHASE EPS PANEL FIXING WASHER AND SCREW DOWNPIPE WITH BRACKET NOTE: SCREWS TO BE MIN FIXED THROUGH TO 25 MM DEPTH INTO STUD SUPPORT PLATE TYPICAL DOWNPIPE FIXING DETAIL - CAVITY SYSTEM...
8 Maintenance In order to get the best performance and maintain your warranty of the Chase EPS Cladding System we recommend that the following maintenance program is undertaken. MAINTENANCE FOR ACRYLIC BASED Check areas subject to cold and damp conditions...
9 Warranty Chase Building Supplies Pty Ltd (“Chase”) warrants that for a period of 7 years from the date of purchase that Chase EPS External Wall Cladding System (the “Product”) will be free from defects due to defective manufacturing workmanship or materials subject to compliance with the conditions below.