Download Print this page

Elo TouchSystems E351978 Assembly Instructions page 3

Kit-brkt-self-service-15-22-and-4.0

Advertisement

3
Android 2.0/3.0/4.0 Landscape
Top Landscape
Add (2) screws from bag "L" to top 100 mm
VESA positions. Leave ~3mm (1/8") gap for
mounting to display bracket.
Remove cable cover(s) before mounting
displays on stand.
Cable
direction
See Wallaby™ assembly instructions (QIG600073
4
steps 1-5 for counter stand, or QIG600074 steps
1-7 for floor stand) before proceeding.
I-Series
Mount
, add (2) screws from bag
"L" to bottom VESA positions.
power, LAN cables
Route
through
bottom of stand head. Route
USB
cable or other
if used.
Return to Wallaby Countertop Stand QIG step
18 or Wallaby Floor Stand QIG step 20
Add tie-wrap
USB Hub
© Copyright 2021 Elo Touch Solutions, Inc.
3

Advertisement

loading